共 50 条
- [1] Mining system for remaining coal of final highwall Journal of Mining Science, 2011, 47 : 771 - 777
- [3] Study on influence of excavation sequence on the stability of coal pillar under final highwall with auger mining PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL V, PTS A AND B, 2005, 5 : 1664 - 1669
- [4] Highwall mining system with backfilling MINE PLANNING AND EQUIPMENT SELECTION 2000, 2000, : 333 - 338
- [5] Application of Highwall Mining System to Recover Residual Coal in End-walls INTERNATIONAL CONFERENCE ON EARTH SCIENCE AND TECHNOLOGY PROCEEDINGS, 2013, 6 : 311 - 318
- [6] Some considerations of highwall mining systems in coal mines PROCEEDINGS OF THE SEVENTEENTH INTERNATIONAL MINING CONGRESS AND EXHIBITION OF TURKEY, 2001, : 269 - 276
- [7] Layout design and case study for highwall mining of coal NINTH INTERNATIONAL CONGRESS ON ROCK MECHANICS, VOLS 1 & 2, 1999, : 265 - 268
- [8] EXPERIMENTAL RESEARCH ON PRESPLITTING BLASTING OF THE FINAL HIGHWALL OF AN OPENCAST COAL MINE JOURNAL OF THE BALKAN TRIBOLOGICAL ASSOCIATION, 2016, 22 (03): : 2857 - 2869