Detecting biological responses to flow management: Missed opportunities; Future directions

被引:83
作者
Souchon, Yves [1 ]
Sabaton, Catherine [2 ]
Deibel, Robert [3 ]
Reiser, Dudley
Kershner, Jeffrey [4 ]
Gard, Mark [5 ]
Katopodis, Christos [6 ]
Leonard, Paul [7 ]
Poff, N. Leroy [8 ]
Miller, William J. [9 ]
Lamb, Berton Lee [10 ]
机构
[1] Cemagref, Quantitat Hydroecol Lab, F-69336 Lyon 09, France
[2] Elect France, Paris, France
[3] US Forest Serv, Ft Collins, CO USA
[4] US Geol Survey, Bozeman, MT USA
[5] US Fish & Wildlife Serv, Sacramento, CA USA
[6] Fisheries & Oceans Canada, Inst Freshwater, Winnipeg, MB R3T 2N6, Canada
[7] ENTRIX Environm Consultants, Atlanta, GA USA
[8] Colorado State Univ, Ft Collins, CO 80523 USA
[9] Miller Ecol Consultants Inc, Ft Collins, CO USA
[10] US Geol Survey, Ft Collins, CO USA
关键词
habitat modelling; hydropower; relicensing; monitoring; environmental flows; biological responses; Phabsim/IFIM; science-based management; long-term datasets;
D O I
10.1002/rra.1134
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The conclusions of numerous stream restoration assessments all around the world are extremely clear and convergent: there has been insufficient appropriate monitoring to improve general knowledge and expertise. In the specialized field of instream flow alterations, we consider that there are several opportunities comparable to full-size experiments. Hundreds of water management decisions related to instream flow releases have been made by government agencies, native peoples, and non-governmental organizations around the world. These decisions are based on different methods and assumptions and many flow regimes have been adopted by formal or informal rules and regulations. Although, there have been significant advances in analytical capabilities, there has been very little validation monitoring of actual outcomes or research related to the response of aquatic dependent species to new flow regimes. In order to be able to detect these kinds of responses and to better guide decision, a general design template is proposed. The main steps of this template are described and discussed, in terms of objectives, hypotheses, variables, time scale, data management, and information, in the spirit of adaptive management. The adoption of such a framework is not always easy, due to differing interests of actors for the results, regarding the duration of monitoring, nature of funding and differential timetables between facilities managers and technicians. Nevertheless, implementation of such a framework could help researchers and practitioners to coordinate and federate their efforts to improve the general knowledge of the links between the habitat dynamics and biological aquatic responses. Copyright (C) 2008 John Wiley & Sons, Ltd.
引用
收藏
页码:506 / 518
页数:13
相关论文
共 89 条
[11]  
Bovee K. D., 1998, STREAM HABITAT ANAL
[12]  
Bowen ZH, 1998, T AM FISH SOC, V127, P455, DOI 10.1577/1548-8659(1998)127<0455:EOGHCF>2.0.CO
[13]  
2
[14]  
BOWEN ZH, 1998, THESIS AUBURN U AUBU
[15]   A population dynamics model and habitat simulation as a tool to predict brown trout demography in natural and bypassed stream reaches [J].
Capra, H ;
Sabaton, C ;
Gouraud, V ;
Souchon, Y ;
Lim, P .
RIVER RESEARCH AND APPLICATIONS, 2003, 19 (5-6) :551-568
[16]  
CHAN MD, 2001, THESIS U VIRGINIA BL
[17]  
Dilts E., 2005, P 2005 GEORG WAT RES
[18]   Relationship between chinook salmon (Oncorhynchus tshawytscha) redd densities and PHABSIM-predicted habitat in the Merced and Lower American rivers, California [J].
Gallagher, SP ;
Gard, MF .
CANADIAN JOURNAL OF FISHERIES AND AQUATIC SCIENCES, 1999, 56 (04) :570-577
[19]  
Ginot V, 1998, LOGICIEL EVHA 2 0 EV
[20]   NEAR-SUBSTRATE HYDRAULIC CONDITIONS UNDER ARTIFICIAL FLOODS FROM PEAKING HYDROPOWER OPERATION - A PRELIMINARY-ANALYSIS OF DISTURBANCE INTENSITY AND DURATION [J].
GORE, JA ;
NIEMELA, S ;
RESH, VH ;
STATZNER, B .
REGULATED RIVERS-RESEARCH & MANAGEMENT, 1994, 9 (01) :15-34