A Control Structure for Smooth Transfer From Grid-Connected to Islanded Operation of Distributed Synchronous Generators

被引:11
作者
Piardi, Artur B. [1 ]
Geraldi Jr, Edson L. [2 ]
Grilo, Ahda P. [3 ]
Reginatto, Romeu [4 ]
Ramos, Rodrigo A. [5 ]
机构
[1] Itaipu Technol Pk Fdn, Lab Automat & Simulat Elect Syst, BR-85867900 Foz Do Iguacu, Brazil
[2] Fed Ctr Technol Educ Minas Gerais, Elect Dept, BR-37250000 Nepomuceno, Brazil
[3] Fed Univ ABC, BR-09210580 Santo Andre, SP, Brazil
[4] Western Parana State Univ, Ctr Engn & Exact Sci, BR-85867900 Foz Do Iguacu, Brazil
[5] Univ Sao Paulo, Sao Carlos Sch Engn, Dept Elect & Comp Engn, BR-13566590 Sao Carlos, Brazil
关键词
Voltage control; Switches; Reactive power; Generators; Transient analysis; Voltage measurement; Distributed Generation; Islanding; Voltage Control; Reactive Power Control; MODE TRANSFER; ANTIWINDUP; INVERTERS; BUMPLESS; RELAYS;
D O I
10.1109/TPWRD.2019.2931174
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The possibility of operating distributed generation (DG) in islanded mode brings several benefits but still faces some problems, especially related to the transition from a grid-connected to an islanded operating condition. When connected to the main grid, DG units operate in PQ mode. During this transition, their controls must be changed to regulate frequency and voltage. The delay for islanding detection, associated with abrupt changes in the control references, may result in large and detrimental transients. This paper proposes a new control structure for a distributed synchronous generator (DSG) to allow a smooth transition from the grid-connected to the islanded operation mode. The proposed control structure uses a compensation loop that was conceived based on the main ideas of the anti-windup bumpless transfer (AWBT) theory (although it is not, strictly speaking, an AWBT controller). The results show that the proposed structure ensures smaller excursions of the DSG variables during the transition and, therefore, the possibility of a successful formation of the islanded system is extended to a wider range of operating conditions. Moreover, with the proposed control, the success of this transition does not depend on the islanding detection time, which is the main contribution of this paper.
引用
收藏
页码:929 / 936
页数:8
相关论文
共 32 条
  • [31] The L2 (l2) bumpless transfer problem:: its definition and solution
    Zaccarian, L
    Teel, AR
    [J]. 2004 43RD IEEE CONFERENCE ON DECISION AND CONTROL (CDC), VOLS 1-5, 2004, : 5505 - 5510
  • [32] Transient stability of a distribution subsystem during fault-initiated switching to islanded operation
    Zheng, Wei
    Crossley, Peter
    Xu, Bingyin
    Qi, Haijie
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2018, 97 : 418 - 427