Cyclic railway timetabling: A stochastic optimization approach

被引:0
|
作者
Kroon, Leo G. [1 ,2 ]
Dekker, Rommert [3 ]
Vromans, Michiel J. C. M. [4 ]
机构
[1] NS Reizigers, Dept Logist, NL-3500 HA Utrecht, Netherlands
[2] Erasmus Univ, Rotterdam Sch Mgmt, NL-3000 DR Rotterdam, Netherlands
[3] Erasmus Univ, Rotterdam Sch Econ, NL-3000 DR Rotterdam, Netherlands
[4] Network Planning, ProRail, NL-3500 Utrecht, Netherlands
来源
ALGORITHMIC METHODS FOR RAILWAY OPTIMIZATION | 2007年 / 4359卷
关键词
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Real-time railway operations are subject to stochastic disturbances. However, a railway timetable is a deterministic plan. Thus a timetable should be designed in such a way that it can absorb the stochastic disturbances as well as possible. To that end, a timetable contains buffer times between trains and supplements in running times and dwell times. This paper first describes a stochastic optimization model that can be used to find an optimal allocation of the running time supplements of a single train on a number of consecutive trips along the same line. The aim of this model is to minimize the average delay of the train. The model is then extended such that it can be used to improve a given cyclic timetable for a number of trains on a common railway infrastructure. Computational results show that the average delay of the trains can be reduced substantially by applying relatively small modifications to the timetable. In particular, allocating the running time supplements in a different way than what is usual in practice can be useful.
引用
收藏
页码:41 / +
页数:3
相关论文
共 50 条
  • [31] Railway timetabling using Lagrangian relaxation
    Brannlund, U
    Lindberg, PO
    Nou, A
    Nilsson, JE
    TRANSPORTATION SCIENCE, 1998, 32 (04) : 358 - 369
  • [32] Resolving instability in railway timetabling problems
    Besinovic, Nikola
    Quaglietta, Egidio
    Goverde, Rob M. P.
    EURO JOURNAL ON TRANSPORTATION AND LOGISTICS, 2019, 8 (05) : 833 - 861
  • [33] TRAINWORLD: A POWERFUL TOOL FOR RAILWAY TIMETABLING
    Chen, I-Chang
    Hsu, Shu-Keng
    Hsu, Hsiu-Hao
    Chen, Chuen-Yih
    Lin, Dung-Ying
    Lee, Wei-Hsun
    Lee, Yusin
    PROCEEDING OF THE ASME JOINT RAIL CONFERENCE, 2013, 2013,
  • [34] Timetabling for strategic passenger railway planning
    Polinder, Gert-Jaap
    Schmidt, Marie
    Huisman, Dennis
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2021, 146 : 111 - 135
  • [35] Integrated Optimization of Line Planning, Timetabling and Rolling Stock Allocation for Urban Railway Lines
    Zhou, Wenliang
    Oldache, Mehdi
    SUSTAINABILITY, 2021, 13 (23)
  • [36] Railway timetabling with integrated passenger distribution
    Hartleb, Johann
    Schmidt, Marie
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 298 (03) : 953 - 966
  • [37] Cyclic transfers in school timetabling
    Post, Gerhard
    Ahmadi, Samad
    Geertsema, Frederik
    OR SPECTRUM, 2012, 34 (01) : 133 - 154
  • [38] Cyclic transfers in school timetabling
    Gerhard Post
    Samad Ahmadi
    Frederik Geertsema
    OR Spectrum, 2012, 34 : 133 - 154
  • [39] Hybrid Demand-Driven and Cyclic Timetabling Considering Rolling Stock Circulation for a Bidirectional Railway Line
    Yin, Yonghao
    Li, Dewei
    Besinovic, Nikola
    Cao, Zhichao
    COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2019, 34 (02) : 164 - 187
  • [40] Integrating stop planning, timetabling and rolling stock planning on high-speed railway lines: A multi-objective optimization approach
    Yang, Lin
    Li, Dewei
    Wang, Hui
    Gao, Yuan
    EXPERT SYSTEMS WITH APPLICATIONS, 2024, 237