Simulation of recovery of upper remnant coal pillar while mining the ultra-close lower panel using longwall top coal caving

被引:45
作者
Feng, Guorui [1 ]
Wang, Pengfei [1 ]
机构
[1] Taiyuan Univ Technol, Coll Min Engn, Taiyuan 030024, Peoples R China
基金
中国国家自然科学基金;
关键词
Simulation; Remnant coal pillars; Ultra-close; Dirt band; Longwall top coal caving;
D O I
10.1016/j.ijmst.2019.12.017
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
With the depletion of easily minable coal seams, less favorable reserves under adverse conditions have to be mined out to meet the market demand. Due to some historical reasons, large amount of remnant coal was left unrecovered. One such case history occurred with the remnant rectangular stripe coal pillars using partial extraction method at Guandi Mine, Shanxi Province, China. The challenge that the coal mine was facing was that there is an ultra-close coal seam right under it with an only 0.8-1.5 m sandstone dirt band in between. The simulation study was carried out to investigate the simultaneous recovery of upper remnant coal pillars while mining the ultra-close lower panel using longwall top coal caving (LTCC). The remnant coal pillar was induced to cave in as top coal in LTCC system. Physical modelling shows that the coal pillars are the abutments of the stress arch structure formed within the overburden strata. The stability of overhanging roof strata highly depends on the stability of the remnant coal pillars. And the gob development (roof strata cave-in) is intermittent with the cave-in of these coal pillars and the sandstone dirt band. FLAC3D numerical modelling shows that the multi-seam interaction has a significant influence on mining-induced stress environment for mining of lower panels. The pattern of the stress evolution on the coal pillars with the advance of the lower working face was found. It is demonstrated that the stress relief of a remnant coal pillar enhances the caveability of the pillars and sandstone dirt band below. (C) 2020 Published by Elsevier B.V. on behalf of China University of Mining & Technology.
引用
收藏
页码:55 / 61
页数:7
相关论文
共 11 条
[1]   Vertical stress and stability of interburden over an abandoned pillar working before upward mining: a case study [J].
Bai, Jinwen ;
Feng, Guorui ;
Wang, Shanyong ;
Qi, Tingye ;
Yang, Jian ;
Guo, Jun ;
Li, Zhen ;
Du, Xianjie ;
Wang, Zehua ;
Du, Yunlou ;
Zhang, Yujiang .
ROYAL SOCIETY OPEN SCIENCE, 2018, 5 (08)
[2]  
BP, 2019, EN OUTL 2019
[3]   Strip Coal Pillar Design Based on Estimated Surface Subsidence in Eastern China [J].
Chen Shaojie ;
Wang Hailong ;
Wang Huaiyuan ;
Guo Weijia ;
Li Xiushan .
ROCK MECHANICS AND ROCK ENGINEERING, 2016, 49 (09) :3829-3838
[4]   Extraction of the remnant coal pillar in regular and irregular shapes: A case study [J].
Chen, Yong ;
Ma, Shuqi ;
Cao, Qijia .
JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2018, 55 :191-203
[5]  
Esterhuizen E., 2010, Proceedings of the 29th International Conference on Ground Control in Mining, P46
[6]   Stability of Gate Roads Next to an Irregular Yield Pillar: A Case Study [J].
Feng, Guorui ;
Wang, Pengfei ;
Chugh, Yoginder P. .
ROCK MECHANICS AND ROCK ENGINEERING, 2019, 52 (08) :2741-2760
[7]  
Itasca Consulting Group Inc, 2018, FLAC3D
[8]  
Ren, 2016, P 35 INT C GROUND CO, P1
[9]   A coupled macro- and meso-mechanical model for heterogeneous coal [J].
Wang, Jiachen ;
Wang, Zhaohui ;
Yang, Shengli .
INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2017, 94 :64-81
[10]   Study on the width of the non-elastic zone in inclined coal pillar for strip mining [J].
Wei, Gao .
INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2014, 72 :304-310