Reliability and efficiency of pollution removal during long-term operation of a one-stage constructed wetland system with horizontal flow

被引:47
|
作者
Jozwiakowski, Krzysztof [1 ]
Bugajski, Piotr [2 ]
Mucha, Zbigniew [3 ]
Wojcik, Wlodzimierz [4 ]
Jucherski, Andrzej [5 ]
Nastawny, Maria [5 ]
Siwiec, Tadeusz [6 ]
Mazur, Andrzej [1 ]
Obroslak, Radomir [1 ]
Gajewska, Magdalena [7 ]
机构
[1] Univ Life Sci Lublin, Dept Environm Engn & Geodesy, Leszczynskiego 7, PL-20069 Lublin, Poland
[2] Agr Univ Krakow, Dept Sanit Engn & Water Management, Al Mickiewicza 24-28, PL-30059 Krakow, Poland
[3] Cracow Univ Technol, Inst Water Supply & Environm Protect, Warszawska 24, PL-31155 Krakow, Poland
[4] Krosno State Coll, Dept Environm Engn, Rynek 1, PL-38400 Krosno, Poland
[5] Inst Technol & Life Sci Falenty, Mt Ctr Studies & Implementat Tylicz, Pulaskiego 25A, PL-33383 Tylicz, Poland
[6] Warsaw Univ Live Sci, Dept Civil Engn, Nowoursynowska 166, PL-02787 Warsaw, Poland
[7] Gdansk Univ Technol, Dept Water & Wastewater Technol, Narutowicza 11-12, PL-80233 Gdansk, Poland
关键词
Reliability; Pollution removal; Wastewater treatment; Constructed wetland; Horizontal flow; SUBSURFACE FLOW; SEWAGE-TREATMENT; WATER; NITROGEN; QUALITY;
D O I
10.1016/j.seppur.2017.06.043
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
The paper presents the results of a study of the reliability and efficiency of pollutant removal during long term operation of a one-stage constructed wetland system with horizontal flow. The flow rate of the wastewater treatment plant was 1.2 m(3) d(-1), during the research period. Physical and chemical analyses of raw wastewater and treated effluent were carried out in the years 1997-2010 (14 years). During this study period, 56 series of analyses were performed and 112 wastewater samples were collected. The average efficiencies of BOD5 (Biochemical Oxygen Demand), COD (Chemical Oxygen Demand) and TSS (Total Suspended Solids) removal in the investigated facility during the 14 years of its operation were respectively: 84.7%, 80.9%, and 62.4%. The average values of these parameters in the treated wastewater were significantly lower than the values deemed acceptable by relevant regulations in Poland. The reliabilities of the wastewater treatment plant, based on the Weibull reliability theory for acceptable values of pollution parameters in the effluent of the treatment plant, were as follows: BOD5 - 92%, COD - 98%, TSS - 90%. The conducted analysis showed that the operational reliability of the one-stage horizontal subsurface flow constructed wetland (HSFCW) over the operation period was insufficient according to the Polish standards. Improvement of the reliability of the analyzed system by introduction of additional purification elements, such as irrigated biological beds or a constructed wetland with vertical wastewater flow, was recommended. (C) 2017 Elsevier B.V. All rights reserved.
引用
收藏
页码:60 / 66
页数:7
相关论文
共 50 条
  • [31] Long-term operation of an upflow anaerobic sludge blanket reactor coupled with a two-stage constructed wetland for domestic wastewater treatment
    Seintos, T.
    Koukoura, A.
    Statiris, E.
    Noutsopoulos, C.
    Mamais, D.
    Masi, F.
    Prado, O.
    Rizzo, A.
    Bartroli, A.
    Stasinakis, A. S.
    Malamis, S.
    CHEMICAL ENGINEERING JOURNAL, 2024, 500
  • [32] Long-term phosphorus and nitrogen removal processes and preferential flow paths in Northern constructed peatlands
    Ronkanen, Anna-Kaisa
    Klove, Bjorn
    ECOLOGICAL ENGINEERING, 2009, 35 (05) : 843 - 855
  • [33] Long-term removals of organic micro-pollutants in reactive media of horizontal subsurface flow constructed wetland treating landfill leachate
    Witthayaphirom, Chayanid
    Chiemchaisri, Chart
    Chiemchaisri, Wilai
    Ogata, Yuka
    Ebie, Yoshitaka
    Ishigaki, Tomonori
    BIORESOURCE TECHNOLOGY, 2020, 312
  • [34] THE EFFICIENCY OF POLLUTION REMOVAL FROM DOMESTIC WASTEWATER IN CONSTRUCTED WETLAND SYSTEMS WITH VERTICAL FLOW WITH COMMON REED AND GLYCERIA MAXIMA
    Debska, Anna
    Jozwiakowski, Krzysztof
    Gizinska-Gorna, Magdalena
    Pytka, Aneta
    Marzec, Michal
    Sosnowska, Bozena
    Pienko, Agata
    JOURNAL OF ECOLOGICAL ENGINEERING, 2015, 16 (05): : 110 - 118
  • [35] Long-term effects of phosphorus deficiency on one-stage partial nitrification-anammox system and recovery strategies
    Zhang, Liang
    Tian, Zhe
    Qian, Yunzhi
    Chen, Fuqiang
    Li, Yu -You
    Wang, Xueke
    Fu, Cuilian
    Chi, Yongzhi
    JOURNAL OF CLEANER PRODUCTION, 2023, 402
  • [36] Performance efficiency and water quality index of a two-stage horizontal subsurface flow constructed wetland system polishing anaerobically treated brewery effluent
    Alayu, Ermias
    Leta, Seyoum
    JOURNAL OF WATER PROCESS ENGINEERING, 2021, 42
  • [37] Removal efficiency of nitrate, phosphate, fecal and total coliforms by horizontal subsurface flow-constructed wetland from domestic wastewater
    Kalankesh, Laleh R.
    Rodriguez-Couto, Susana
    Shahamat, Yousef Dadban
    Asgarnia, Hossein Ali
    ENVIRONMENTAL HEALTH ENGINEERING AND MANAGEMENT JOURNAL, 2019, 6 (02): : 105 - 111
  • [38] Long-term assessment on performance and seasonal optimal operation of a full-scale integrated multiple constructed wetland-pond system
    Pu, Yashuai
    Li, Yiping
    Zhu, Liqin
    Cheng, Yu
    Nuamah, Linda A.
    Zhang, Haikuo
    Chen, Hongwei
    Du, Guanchao
    Wang, Ling
    Song, Congqing
    SCIENCE OF THE TOTAL ENVIRONMENT, 2023, 862
  • [39] Constructed wetlands with horizontal subsurface flow in the Czech Republic: Two long-term case studies
    Vymazal, Jan
    DESALINATION AND WATER TREATMENT, 2009, 4 (1-3) : 40 - 44
  • [40] Evaluation of nutrient removal efficiency and microbial enzyme activity in a baffled subsurface-flow constructed wetland system
    Cui, Lihua
    Ouyang, Ying
    Gu, Wenjie
    Yang, Weizhi
    Xu, Qiaoling
    BIORESOURCE TECHNOLOGY, 2013, 146 : 656 - 662