Priority Determination of Underwater Tourism Site Development in Gorontalo Province using Analytical Hierarchy Process (AHP)

被引:2
作者
Rohandi, M. [1 ]
Tuloli, M. Y. [2 ]
Jassin, R. T. [1 ]
机构
[1] Univ Negeri Gorontalo, Dept Informat Engn, Fac Engn, Gorontalo, Indonesia
[2] Univ Negeri Gorontalo, Dept Civil Engn, Fac Engn, Gorontalo, Indonesia
来源
2ND INTERNATIONAL CONFERENCE ON INNOVATION IN ENGINEERING AND VOCATIONAL EDUCATION | 2018年 / 306卷
关键词
D O I
10.1088/1757-899X/306/1/012085
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This research aims to determine the development of priority of underwater tourism in Gorontalo province using the Analytical Hierarchy Process (AHP) method which is one of DSS methods applying Multi-Attribute Decision Making (MADM). This method used 5 criteria and 28 alternatives to determine the best priority of underwater tourism site development in Gorontalo province. Based on the AHP calculation it appeared that the best priority development of underwater tourism site is Pulau Cinta whose total AHP score is 0.489 or 48.9%. This DSS produced a reliable result, faster solution, time-saving, and low cost for the decision makers to obtain the best underwater tourism site to be developed.
引用
收藏
页数:6
相关论文
共 10 条
[1]  
Al Harbi K M A, 2001, MANAGEMENT INT J PRO, P19
[2]  
Ameri A, 2013, GLOBAL J HUMAN SOCIA, V13
[3]  
Belton V, 1983, OMEGA, V1, P143
[4]  
Geoff C, 2017, ANAL HIERARCHY PROCE
[5]  
Saaty T, 1980, ANAL HIERARCHY PROCE, V1, P69
[6]  
Saaty T. L., 1990, EUROPEAN J OPERATION
[7]  
Spillane J J, 1994, TOURISM INDONESIA EC
[8]  
Stajanovic M, 2013, SAFETY ENG J, V3, P115
[9]  
Trisnawarman D, 2007, DSS APPL FOOD MENU S
[10]  
Turban Efraim, 2005, DECISION SUPPORT SYS, V1