ADAMA-II wind farm performance assessment in comparison to feasibility study

被引:2
作者
Debru, Abeba [1 ]
Bayray, Mulu [2 ]
Molinas, Marta [3 ]
机构
[1] Mekelle Univ, Sch Elect & Comp Engn, Ethiopian Inst Technol Mekelle, POB 231, Mekelle, Tigray, Ethiopia
[2] Mekelle Univ, Sch Mech & Ind Engn, Ethiopian Inst Technol Mekelle, Mekelle, Ethiopia
[3] NTNU, Dept Engn Cybernet, Trondheim, Norway
关键词
Adama-II wind farm; wind farm performance; wind characteristics; annual energy production; capacity factor; availability;
D O I
10.1177/0309524X211035151
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The objective of this paper was to assess the performance of the Adama-II Wind Farm in comparison to the feasibility study. Using 1-year mast data, the site potential was reassessed by WAsP software and the performance of wind turbine generators was assessed by 2 years of SCADA data. The obtained mean annual wind speed and power density were 7.75 m/s, and 462 W/m(2) while in the feasibility study, 9.55 m/s, and 634.6 W/m(2), which resulted in 18.8%, and 27.1% deviations respectively. The prevailing and secondary wind directions obtained were ENE and NE with 35.7% and 19.1% while, in the feasibility study, ENE with 36.5% and E with 17.3%. From the SCADA data, the Capacity factor, Annual Energy Production (AEP), and Availability of wind turbines were determined as 30.5%, 398 GWh, and 95.1%. The reasons for the deviation were difference in long-term correction data and weather conditions during study period.
引用
收藏
页码:503 / 517
页数:15
相关论文
共 22 条
[1]  
[Anonymous], 2011, 61400261 IEEE TS
[2]  
[Anonymous], 2014, IEC TS 61400-26-2.
[3]  
[Anonymous], 2010, P IET INT C POW EL M
[4]  
Asian Development Bank, 2014, Guidelines for Wind Resource Assessment: Best Practices for Countries Initiating Wind Development
[5]   Capacity factor of wind power realized values vs. estimates [J].
Boccard, Nicolas .
ENERGY POLICY, 2009, 37 (07) :2679-2688
[6]   Wind turbine availability: Should it be time or energy based? - A case study in Ireland [J].
Conroy, Niamh ;
Deane, J. P. ;
Gallachoir, Brian P. O. .
RENEWABLE ENERGY, 2011, 36 (11) :2967-2971
[7]  
Energypedia, 2016, ETH EN SIT
[8]  
Hydro China Corporation, 2013, AS 2 WIND POW PROJ
[9]  
Kr?ger, 2016, COMP PRECONSTRUCTION
[10]   Uncertainty analysis of wind energy potential assessment [J].
Kwon, Soon-Duck .
APPLIED ENERGY, 2010, 87 (03) :856-865