Group-based production scheduling for make-to-order production

被引:6
作者
Yu, Chunyang [1 ]
Ji, Yangjian [1 ]
Qi, Guoning [1 ]
Gu, Xinjian [1 ]
Tao, Liyan [2 ]
机构
[1] Zhejiang Univ, Dept Mech Engn, Ind Engn Ctr, Hangzhou 310027, Zhejiang, Peoples R China
[2] Hangzhou Dianzi Univ, Res Inst Ind Engn & Management, Sch Management, Hangzhou 310018, Zhejiang, Peoples R China
基金
中国国家自然科学基金;
关键词
Production scheduling; Tabu search; Process similarity; Make-to-order; Optimization; Lead time; OPTIMIZATION; SYSTEMS;
D O I
10.1007/s10845-013-0817-z
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In make-to-order (MTO) production, various parts from different product structures may share similar processes. However, traditional production scheduling in the MTO environment considers only similarity of due dates but little process similarity. Different from traditional scheduling, aggregating the similarities of due dates and production processes, a group-based production scheduling approach is proposed. Group-based production scheduling takes order groups as scheduling units and part groups as scheduling objects to minimize the total manufacturing lead time in a planning period. Besides, a group based matrix and a production capacity constraint estimation method are proposed for formulating scheduling constraints. To ensure the quality result, a tabu search based algorithm of production scheduling is proposed. Results of a case study reveal that the group-based method can reduce the manufacturing lead time because of the reducing of processing set-up efforts.
引用
收藏
页码:585 / 600
页数:16
相关论文
共 32 条