Simulation-based benchmarking of production control schemes for complex manufacturing systems

被引:33
作者
Moench, Lars [1 ]
机构
[1] Fernuniv, Fac Math & Comp Sci, Enterprisewide Software Syst, D-58097 Hagen, Germany
关键词
complex manufacturing systems; simulation-based performance evaluation; performance measures; software architecture; benchmark examples;
D O I
10.1016/j.conengprac.2006.05.010
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, benchmarking efforts for production control approaches applied to complex manufacturing systems are described. Complex manufacturing systems are characterized by a large number of products, an over time changing product mix, sequence-dependent set-up times, unrelated parallel machines, a mix of different process types, and internal and external disturbances. In order to ensure comparison possibilities among different production control approaches, the usage of a simulation test-bed and a software architecture that allows for plug in of different production control software are suggested. Different application areas, the advantages, and also the limitations of the suggested approach are discussed. (c) 2006 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1381 / 1393
页数:13
相关论文
共 43 条
[11]   Grand challenges in modeling and simulation of complex manufacturing systems [J].
Fowler, JW ;
Rose, O .
SIMULATION-TRANSACTIONS OF THE SOCIETY FOR MODELING AND SIMULATION INTERNATIONAL, 2004, 80 (09) :469-476
[12]  
GOREN S, 2002, THESIS BILKENT U ANK
[13]  
Habenicht I, 2002, PROCEEDINGS OF THE 2002 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, P1406, DOI 10.1109/WSC.2002.1166411
[14]   An agent architecture for manufacturing control:: manAge [J].
Heikkilä, T ;
Kollingbaum, M ;
Valckenaers, P ;
Bluemink, GJ .
COMPUTERS IN INDUSTRY, 2001, 46 (03) :315-331
[15]   Intelligent agent based framework for manufacturing systems control [J].
Heragu, SS ;
Graves, RJ ;
Kim, BI ;
St Onge, A .
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART A-SYSTEMS AND HUMANS, 2002, 32 (05) :560-573
[16]   Finite-capacity production planning algorithms for a semiconductor wafer fabrication facility [J].
Horiguchi, K ;
Raghavan, N ;
Uzsoy, R ;
Venkateswaran, S .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (05) :825-842
[17]  
*IMS NOE, 2006, INT MAN SYST NETW EX
[18]  
Kelton DW, 2000, SIMULATION MODELLING
[19]   Evaluation and comparison of production schedules [J].
Kempf, K ;
Uzsoy, R ;
Smith, S ;
Gary, K .
COMPUTERS IN INDUSTRY, 2000, 42 (2-3) :203-220
[20]  
Kindler E, 2004, LECT NOTES COMPUT SC, V2635, P165