Simulation-based benchmarking of production control schemes for complex manufacturing systems

被引:33
作者
Moench, Lars [1 ]
机构
[1] Fernuniv, Fac Math & Comp Sci, Enterprisewide Software Syst, D-58097 Hagen, Germany
关键词
complex manufacturing systems; simulation-based performance evaluation; performance measures; software architecture; benchmark examples;
D O I
10.1016/j.conengprac.2006.05.010
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, benchmarking efforts for production control approaches applied to complex manufacturing systems are described. Complex manufacturing systems are characterized by a large number of products, an over time changing product mix, sequence-dependent set-up times, unrelated parallel machines, a mix of different process types, and internal and external disturbances. In order to ensure comparison possibilities among different production control approaches, the usage of a simulation test-bed and a software architecture that allows for plug in of different production control software are suggested. Different application areas, the advantages, and also the limitations of the suggested approach are discussed. (c) 2006 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1381 / 1393
页数:13
相关论文
共 43 条
[1]  
[Anonymous], WAFER FABRICATION FA
[2]   A STATE-OF-THE-ART SURVEY OF DISPATCHING RULES FOR MANUFACTURING JOB SHOP OPERATIONS [J].
BLACKSTONE, JH ;
PHILLIPS, DT ;
HOGG, GL .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1982, 20 (01) :27-45
[3]  
BRAMBILLA P, 2004, P 11 IFAC S INF CONT
[4]  
Brennan RW, 2000, PROCEEDINGS OF THE 2000 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, P1747, DOI 10.1109/WSC.2000.899165
[5]   Benchmarking the performance of manufacturing control systems: design principles for a web-based simulated testbed [J].
Cavalieri, S ;
Macchi, M ;
Valckenaers, P .
JOURNAL OF INTELLIGENT MANUFACTURING, 2003, 14 (01) :43-58
[6]   An experimental benchmarking of two multi-agent architectures for production scheduling and control [J].
Cavalieri, S ;
Garetti, M ;
Macchi, M ;
Taisch, M .
COMPUTERS IN INDUSTRY, 2000, 43 (02) :139-152
[7]  
CAVALIERI S, 1999, 2 INT WORKSH INT MAN
[8]   REAL-TIME DISTRIBUTED SCHEDULING OF HETERARCHICAL MANUFACTURING SYSTEMS [J].
DUFFIE, NA ;
PRABHU, VV .
JOURNAL OF MANUFACTURING SYSTEMS, 1994, 13 (02) :94-107
[9]  
ELADL MK, 1996, P 35 C DEC CONTR KOB
[10]  
Fowler J. W., 1995, Rep. 95062861A-TR