共 31 条
- [1] Aalami B.O., 1998, TIME DEPENDENT ANAL, V1, P384, DOI 10.1002/pse.2260010407
- [2] AYDAN O, 1993, P INT S ASS PREV FAI
- [3] AYDAN O, 1995, P INT S WORKSH ROCK
- [4] BRADY K, 2001, P 15 ICSMGE IST TURK
- [5] Bruce S.M., 2008, 337 LAND TRANSP
- [6] CALVERT S, 2004, P SPIE
- [7] STRESS DISTRIBUTION ALONG A RESIN GROUTED ROCK ANCHOR [J]. INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 1975, 12 (11): : 347 - 351
- [8] FRICKER S, 2006, P 3 INT C BRIDG MAIN
- [10] Inaudi D., 2000, Prog. Structural Engineering Material, V2, P351