CREATIVE CONSTRUCTION CONFERENCE 2015, SELECTED PAPERS
|
2015年
/
123卷
关键词:
delays in works;
statistical analysis;
questionnaire survey;
D O I:
10.1016/j.proeng.2015.10.075
中图分类号:
TU [建筑科学];
学科分类号:
0813 ;
摘要:
Timely implementation of construction works (at the scheduled time) is vital for both the investor and the contractor. Yet construction projects, even those perfectly planned and organized, run the risk of delays. Despite many tools supporting construction management, delays keep occurring in construction projects. The present paper presents the findings of a survey aimed at identifying the most important causes of delays in construction works from the client's perspective. A factor analysis that was performed allow to interpret the dependencies between them. The knowledge can be helpful for minimizing the risk of delays. (C) 2015 Published by Elsevier Ltd.
引用
收藏
页码:182 / 189
页数:8
相关论文
共 23 条
[21]
Sweis G., 2008, International Journal of Project Management, V26, P665, DOI 10.1016/j.ijproman.2007.09.009