Integrated Model for Optimizing Strategic Overhaul Planning of Distributed Pump Stations

被引:3
作者
Pascual, R. [1 ]
Rey, P. A. [2 ]
Hodkiewicz, M. [3 ]
Cruz, C. [4 ]
机构
[1] Pontificia Univ Catolica Chile, Ctr Mineria, Santiago, Chile
[2] Univ Diego Port, Escuela Ingn Ind, Santiago, Chile
[3] Univ Western Australia, Sch Mech Engn, Perth, WA 6009, Australia
[4] Univ Chile, Dept Mech Engn, Santiago, Chile
关键词
Maintenance; Overhaul; Shop maintenance; Degrading operational efficiency; Finite time horizon; Aging water networks; WATER-DISTRIBUTION-SYSTEMS; GENETIC ALGORITHM; OPTIMIZATION; NETWORKS;
D O I
10.1061/(ASCE)CP.1943-5487.0000085
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
An important part of the lifecycle costs for pump stations are the support costs associated with energy and preventive maintenance of the pumps. Both cost terms are interrelated because a trade-off exists between maintaining pumps frequently (with increased pump efficiency, reduced energy costs and increasing maintenance costs, and pump unavailability) and extending the intervals between the overhauls (increased loss of efficiency, increased energy costs, and decreased maintenance costs). The planner needs to forecast pump overhaul demands to determine budget levels because economic resources are limited. This process is assisted by using mathematical programming methods to prioritize funding for equipment requiring renewal in consideration of limited resources in a strategic time horizon (several years). This work proposes an efficient model to define an overhaul maintenance program for a pump network with a large number of pumps (a few hundred in the case study). The model minimizes the discounted total (energy+overhaul) cost by selecting and scheduling pumps for overhaul subject to budget constraints. The formulation uses 0-1 integer programming. DOI: 10.1061/(ASCE)CP.1943-5487.0000085. (C) 2011 American Society of Civil Engineers.
引用
收藏
页码:275 / 282
页数:8
相关论文
共 35 条
[1]   Near-optimal rehabilitation scheduling of water distribution systems based on a multi-objective genetic algorithm [J].
Alvisi, Stefano ;
Franchini, Marco .
CIVIL ENGINEERING AND ENVIRONMENTAL SYSTEMS, 2006, 23 (03) :143-160
[2]  
[Anonymous], P INT C UND INFR RES
[3]  
Ansell J. I., 2004, IMA Journal of Management Mathematics, V15, P151, DOI 10.1093/imaman/15.2.151
[4]  
*ASCE, 2005, REP CARD AM INFR
[5]   Multi-objective pump scheduling optimisation using evolutionary strategies [J].
Barán, B ;
von Lücken, C ;
Sotelo, A .
ADVANCES IN ENGINEERING SOFTWARE, 2005, 36 (01) :39-47
[6]  
Barbarosoglu G., 1995, Engineering Economist, V40, P315, DOI 10.1080/00137919508903158
[7]  
BARGERON JM, 1995, THESIS NAVAL POSTGRA
[8]  
BOULOS PF, 2001, P AM WAT WORKS ASS D
[9]  
Brooke Anthony., 1998, A User's Guide
[10]   Constraint handling methods in pavement maintenance programming [J].
Chan, WT ;
Fwa, TF ;
Hoque, KZ .
TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2001, 9 (03) :175-190