Computer-aided machine-tool selection based on a Fuzzy-AHP approach

被引:176
作者
Duran, Orlando [1 ]
Aguilo, Jose [1 ]
机构
[1] Univ Catol Valparaiso, Escuela Ingn Mec, Valparaiso, Chile
关键词
AHP; machine tools; fuzzy numbers;
D O I
10.1016/j.eswa.2007.01.046
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Investment evaluation methods play an important role in today's competitive manufacturing environment. Shrinking profit margins and diversification require careful analysis of investments and decisions regarding these investments are crucial for the survival of the manufacturing industry. Both economic evaluation criterion and strategic criteria such as flexibility, quality improvement, which are not quantitative in nature, are considered for evaluation. Much has been written about the deficiencies of traditional models for justifying advanced manufacturing systems. The use of fuzzy set theory allows incorporating unquantifiable, incomplete and partially known information into the decision model. In this paper, an analytic hierarchical process (AHP) based on fuzzy numbers multi-attribute method is proposed for the evaluation and justification of an advanced manufacturing system. Finally, an example of machine tool selection is used to illustrate and validate the proposed approach. (C) 2007 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1787 / 1794
页数:8
相关论文
共 13 条
[1]   Fuzzy group decision making for selection among computer integrated manufacturing systems [J].
Bozdag, CE ;
Kahraman, C ;
Ruan, D .
COMPUTERS IN INDUSTRY, 2003, 51 (01) :13-29
[2]  
BUCKLEY JJ, 1985, FUZZY SET SYST, V15, P21, DOI 10.1016/0165-0114(85)90013-2
[3]  
Chui-Yu Chiu, 1994, Engineering Economist, V39, P113, DOI 10.1080/00137919408903117
[4]   Fuzzy multi-criteria decision-making procedure for evaluating advanced manufacturing system investments [J].
Karsak, EE ;
Tolga, E .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2001, 69 (01) :49-64
[5]   A fuzzy analytic hierarchy process approach in modular product design [J].
Lee, WB ;
Lau, H ;
Liu, ZZ ;
Tam, S .
EXPERT SYSTEMS, 2001, 18 (01) :32-42
[7]   Short-termism and the appraisal of AMT capital projects in the US and UK [J].
Lefley, F ;
Sarkis, J .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (02) :341-368
[8]   Evaluation of services using a fuzzy analytic hierarchy process [J].
Mikhailov, L ;
Tsvetinov, P .
APPLIED SOFT COMPUTING, 2004, 5 (01) :23-33
[9]   Development of a justification tool for advanced manufacturing technologies: system-wide benefits value analysis [J].
Ordoobadi, SM ;
Mulvaney, NJ .
JOURNAL OF ENGINEERING AND TECHNOLOGY MANAGEMENT, 2001, 18 (02) :157-184
[10]  
SAATY TL, 2000, ANAL HERARCHY PROCES