共 16 条
- [1] CHEN Yu-min, 2009, BASIC ENG EXAMPLE FL, P17
- [2] GAO W, 2007, P 7 INT C FRACT STRE, P1123
- [3] Guo GL., 2007, J CHINA U MINING TEC, V17, P5, DOI [10.1016/S1006-1266(07)60096-0, DOI 10.1016/S1006-1266(07)60096-0]
- [4] [郭文兵 Guo Wenbing], 2004, [岩石力学与工程学报, Chinese Journal of Rock Mechanics and Engineering], V23, P1996
- [5] Guo Wenbing, 2004, RES NONLINEAR THEORE
- [6] Guo Z., 2003, J XIANGTAN MINING I, V18, P13
- [7] He Guoqing, 1994, MINING SUBSIDENCE SC, P1
- [8] Modeling and numerical optimal simulation of coal pillar's failure process on longwall leaving coal pillar mining [J]. COMPUTER-AIDED DESIGN, MANUFACTURING, MODELING AND SIMULATION, PTS 1-2, 2011, 88-89 : 285 - +
- [9] SINGH SN, 2010, J MINES METALS FUELS, V58, P312
- [10] SONG Zi-ling, 2010, P 2010 2 INT C COMP, P47