Furniture supply chain tactical planning optimization using a time decomposition approach

被引:50
作者
Ouhimmou, M. [1 ,2 ]
D'Amours, S. [1 ,2 ]
Beauregard, R. [2 ,3 ]
Ait-Kadi, D. [1 ,2 ]
Chauhan, S. Singh [4 ]
机构
[1] Univ Laval, Dept Genie Mecan, Quebec City, PQ G1K 7P4, Canada
[2] Univ Laval, CIRRELT, Quebec City, PQ G1K 7P4, Canada
[3] Univ Laval, Dept Sci Bois & Foret, Quebec City, PQ G1K 7P4, Canada
[4] Concordia Univ, John Molson Sch Business, Montreal, PQ H3G 1M8, Canada
关键词
supply chain management; integrated planning; furniture industry; tactical decisions; large scale optimization;
D O I
10.1016/j.ejor.2007.01.064
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We study the supply chain tactical planning problem of an integrated furniture company located in the Province of Quebec, Canada. The paper presents a mathematical model for tactical planning of a subset of the supply chain. The decisions concern procurement, inventory, outsourcing and demand allocation policies. The goal is to define manufacturing and logistics policies that will allow the furniture company to have a competitive level of service at minimum cost. We consider planning horizon of 1 year and the time periods are based on weeks. We assume that customer's demand is known and dynamic over the planning horizon. Supply chain planning is formulated as a large mixed integer programming model. We developed a heuristic using a time decomposition approach in order to obtain good solutions within reasonable time limit for large size problems. Computational results of the heuristic are reported. We also present the quantitative and qualitative results of the application of the mathematical model to a real industrial case. (C) 2007 Elsevier B.V. All rights reserved.
引用
收藏
页码:952 / 970
页数:19
相关论文
共 21 条
[1]   Supply chain optimization in the pulp mill industry -: IP models, column generation and novel constraint branches [J].
Bredström, D ;
Lundgren, JT ;
Rönnqvist, M ;
Carlsson, D ;
Mason, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 156 (01) :2-22
[2]  
BUEHLMANN U, 1998, ANN M FOR PROD SOC T
[3]   Supply chain management in forestry-case studies at Sodra Cell AB [J].
Carlsson, D ;
Rönnqvist, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 163 (03) :589-616
[4]  
CARNIERI C, 1993, FOREST PROD J, V43, P66
[5]   SINGLE-MACHINE SCHEDULING TO MINIMIZE WEIGHTED EARLINESS SUBJECT TO NO TARDY JOBS [J].
CHAND, S ;
SCHNEEBERGER, H .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1988, 34 (02) :221-230
[6]   COORDINATION OF PRODUCTION AND DISTRIBUTION PLANNING [J].
CHANDRA, P ;
FISHER, ML .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 72 (03) :503-517
[7]   STRATEGIC ANALYSIS OF INTEGRATED PRODUCTION-DISTRIBUTION SYSTEMS - MODELS AND METHODS [J].
COHEN, MA ;
LEE, HL .
OPERATIONS RESEARCH, 1988, 36 (02) :216-228
[8]   A relational database approach to a linear programming-based decision support system for production planning in secondary wood product manufacturing [J].
Farrell, RR ;
Maness, TC .
DECISION SUPPORT SYSTEMS, 2005, 40 (02) :183-196
[9]  
Fleischmann B, 2015, SPRING TEXT BUS ECON, P71, DOI 10.1007/978-3-642-55309-7_4
[10]  
FRAYRET JM, 2004, DT2004JMF1 U LAV