Study on interval-based economic evaluation methods for power construction projects

被引:0
作者
Xiao Jun [1 ]
Cui Yan-Yan [1 ]
He Li-Wei [2 ]
机构
[1] Tianjin Univ, Tianjin 300072, Peoples R China
[2] Tianjin Design & Res Inst, Elect Dr, Tianjin, Peoples R China
来源
2007 CONFERENCE PROCEEDINGS IPEC, VOLS 1-3 | 2007年
关键词
interval; economic evaluation; power construction projects; net present value; dynamic payback period; internal rate of return;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper introduces an interval-based approach in economic evaluation on power construction projects. Firstly, interval models are set up to extend classic methods, including Interval Net Present Value method, Interval Payback Period method, Interval Internal Rate of Return method. Additionally, a method to measure risk is also proposed. Then, cases are given to test and compare these interval methods under both certain and uncertain life period conditions. Case study suggests that the interval-based methods are efficient and flexible to deal with evaluation problems on power construction projects, which can effectively judge the feasibility of a project, as well as estimate the risk likely to be undertaken. Finally, these three typical methods are comprehensively compared in order to give instruction of practical application.
引用
收藏
页码:763 / +
页数:2
相关论文
共 16 条
[1]  
AMRAM M, 2001, REAL OPTIONS MANAGIN
[2]  
FAN LZ, 2001, J SYSTEMS ENG, V16, P17
[3]  
FU FL, 2002, J STAT INFORM TRIBUT, V17, P10
[4]   Financial and economic evaluation of projects - With special reference to the electrical power industry [J].
Khatib, H .
POWER ENGINEERING JOURNAL, 1996, 10 (01) :42-54
[5]   Fuzzy capital budgeting [J].
Kuchta, D .
FUZZY SETS AND SYSTEMS, 2000, 111 (03) :367-385
[6]  
WANG BS, 1999, J HEBEI I ARCHITECTU, V10, P59
[7]  
WEI G, 2003, J SHANGHAI U ELECT P, V19, P33
[8]  
WU JW, 2003, NONFERROUS METALS DE, V30, P60
[9]  
XIANG SH, 2002, CONSTRUCTION MANAGEM, V67, P43
[10]  
XIAO J, 2006, CHINA POWER, V39, P1