Barriers to Large-scale Solar Power in Tanzania

被引:58
作者
Aly, Ahmed [1 ]
Moner-Girona, Magda [2 ]
Szabo, Sandor [2 ]
Pedersen, Anders Branth [1 ]
Jensen, Steen Solvang [1 ]
机构
[1] Aarhus Univ, Dept Environm Sci, Frederiksborgvej 399,POB 358, DK-4000 Roskilde, Denmark
[2] Joint Res Ctr, European Commiss, Ispra, Italy
关键词
Barrier analysis; Renewable energy; Qualitative research; Stakeholder-based approach; Sub-Saharan Africa; Tanzania; RENEWABLE ENERGY TECHNOLOGIES; SUB-SAHARAN AFRICA; SUSTAINABLE ENERGY; POLITICAL-ECONOMY; DIFFUSION; SELECTION; DRIVERS; PLANTS; CSP;
D O I
10.1016/j.esd.2018.10.009
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The Tanzanian official power system expansion plan shows a dominant dependence on fossil fuel-fired power plants till 2040. Hence identifying and analysing the underlying barriers for the deployment of large-scale renewables are essential. This study investigates the barriers to large-scale solar power in Tanzania. Key institutional, financial, and technological barriers are identified at different levels. The study uses a qualitative methodology where primary data is collected through 30 semi-structured interviews with experts representing the main electricity sector's stakeholders from public institutions, research institutions, private investors, civil society organizations, development partners, and financial institutions. A stakeholder-based approach which emphasizes the different perceptions of the stakeholder's groups is used to identify the barriers. Institutional barriers for the diffusion of large-scale solar power technologies are found to be predominant, and they often trigger financial and technological barriers. The study consolidates the view that foreign investment and aid directed to expand electrification in Sub-Saharan Africa need to be reshaped in order to be a driving force towards sustainable energy transition in the region. The study argues for the possibility to work on the compatible interests between the pro-renewables development partners and the Tanzanian government (which considers expanding electrification as a political priority) through introducing large-scale solar power projects that help in expanding electrification while being technically and financially supported by the development partners. (C) 2018 European Commission, Joint Research Centre (JRC). Published by Elsevier Inc. on behalf of International Energy Initiative.
引用
收藏
页码:43 / 58
页数:16
相关论文
共 66 条
[1]  
Africa Clean Energy Corridor, 2014, AFRICA CLEAN ENERGY
[2]   Drivers and barriers to rural electrification in Tanzania and Mozambique - Grid-extension, off-grid, and renewable energy technologies [J].
Ahlborg, Helene ;
Hammar, Linus .
RENEWABLE ENERGY, 2014, 61 :117-124
[3]  
Alvesson M., 2017, REFLEXIVE METHODOLOG, V3rd
[4]  
Aly A, 2018, RENEWABLE ENERGY
[5]   Solar power potential of Tanzania: Identifying CSP and PV hot spots through a GIS multicriteria decision making analysis [J].
Aly, Ahmed ;
Jensen, Steen Solvang ;
Pedersen, Anders Branth .
RENEWABLE ENERGY, 2017, 113 :159-175
[6]  
[Anonymous], 2016, NAT 5 DEV PLAN 2016
[7]  
[Anonymous], TANZ SE4ALL ACT AG
[8]  
[Anonymous], 2015, GEN ASSEMBLY, V70
[9]  
[Anonymous], 2017, NAT GAS UT MAST PLAN
[10]  
[Anonymous], 2016, NEARLY 50 COUNTRIES