Fuzzy AHP in prioritizing feeders for maintenance in nuclear power plants

被引:10
|
作者
Srividya, A. [1 ]
Suresh, H. N. [1 ]
Verma, A. K. [1 ]
机构
[1] Indian Inst Technol, Dept Elect Engn, Reliabil Engn Grp, Bombay 400076, Maharashtra, India
来源
2007 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4 | 2007年
关键词
prioritization; feeders; fuzzy numbers; analytic hierarchy process; multi-criteria decision analysis; triangular fuzzy number;
D O I
10.1109/IEEM.2007.4419169
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A furry version of prioritization from among several alternatives under different decision criteria of Saaty's pair wise comparison method is presented in this paper. Each ratio expressing the relative significance of a pair of factors is displayed in a matrix from which suitable weights can be extracted. Since these ratios are essentially fuzzy, they express the opinion of a decision-maker on the importance of a pair of factors. This method is used in such a way that information from experts, who are asked to express their opinions in fuzzy numbers with triangular membership functions, is embedded in it. The method is applied at two levels: beginning with the finding of fuzzy weights for the decision criteria, followed by finding the fuzzy weights for the alternatives under each of the decision criteria. Fuzzy scores for the alternatives are obtained. Using the fuzzy scores, experts will be able to prioritize the alternatives for maintenance activities based on the listed criteria. The method is illustrated for outlet feeders in a nuclear power plant with representative values.
引用
收藏
页码:149 / 153
页数:5
相关论文
共 50 条
  • [21] Using AHP to Choose Optimal Nuclear Power Plant Design
    Kiser, Lauren
    Otero, Luis Daniel
    2021 15TH ANNUAL IEEE INTERNATIONAL SYSTEMS CONFERENCE (SYSCON 2021), 2021,
  • [22] Computer-aided maintenance management systems selection based on a fuzzy AHP approach
    Duran, Orlando
    ADVANCES IN ENGINEERING SOFTWARE, 2011, 42 (10) : 821 - 829
  • [23] A Fuzzy-AHP-Based Decision Support System for Maintenance Strategy Selection in Facility Management
    Pun, K. P.
    Tsang, Y. P.
    Choy, K. L.
    Tang, Valerie
    Lam, H. Y.
    2017 PORTLAND INTERNATIONAL CONFERENCE ON MANAGEMENT OF ENGINEERING AND TECHNOLOGY (PICMET), 2017,
  • [24] Prioritizing Resource and Policy Barriers to Post-Disaster Recovery in Pakistan: A Multi-Expert Fermatean Fuzzy AHP Analysis
    Khan, Abid
    Shah, Ashfaq Ahmad
    Alotaibi, Bader Alhafi
    Khan, Inam
    SUSTAINABILITY, 2024, 16 (23)
  • [25] Assessing flexibility options in power systems using Fuzzy Logic and AHP methods
    Alexopoulos, Dimitrios K.
    Anastasiadis, Anestis G.
    Kaminaris, Stavros D.
    Vokas, Georgios A.
    Psomopoulos, Constantinos S.
    ENERGY REPORTS, 2022, 8 : 776 - 791
  • [26] Risk Assessment of Power Grid Catastrophic Accident Based on AHP and Fuzzy Simulation
    Liu, Ming
    Yao, Gang
    Tian, Nian Jie
    Yuan, Han Yun
    Liu, Nian
    Zhou, Bu Xiang
    Chen, Shi
    Zhang, Jian Mei
    2013 IEEE INTERNATIONAL CONFERENCE ON APPLIED SUPERCONDUCTIVITY AND ELECTROMAGNETIC DEVICES (ASEMD), 2013, : 18 - 21
  • [27] A Hybrid Model to Optimize the Maintenance Policies in the Hydroelectric Power Plants
    Ozcan, Evrencan
    Gur, Seyda
    Eren, Tamer
    JOURNAL OF POLYTECHNIC-POLITEKNIK DERGISI, 2021, 24 (01): : 75 - 86
  • [28] A methodology for the prioritization of operating experience in nuclear power plants
    Weil, R
    Apostolakis, GE
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2001, 74 (01) : 23 - 42
  • [29] Site selection of wind power plants in the Example of Kayseri with the help of CBS and AHP Method
    Urfali, Tugrul
    Geymen, Abdurrahman
    GEOMATIK, 2021, 6 (03): : 227 - 237
  • [30] Safety management of ship power plants based on fuzzy logic
    Turkin, Vladimir A.
    Styazhkin, Alexander A.
    Zagurskiy, Eugene F.
    MARINE INTELLECTUAL TECHNOLOGIES, 2022, (03): : 118 - 123