Raising Transmission Line Steel Towers

被引:0
|
作者
Dupree, Ashley [1 ]
Liu, Fang [2 ]
Rumble, Jonathon [2 ]
Ortegon, Ricardo [2 ]
机构
[1] ITC Holdings Corp, 27175 Energy Way, Novi, MI 48377 USA
[2] Black & Veatch Consulting Engineers, Ann Arbor, MI 48105 USA
来源
ELECTRICAL TRANSMISSION AND SUBSTATION STRUCTURES 2015: TECHNICAL CHALLENGES AND INNOVATIVE SOLUTIONS IN GRID MODERNIZATION | 2015年
关键词
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Recently, ITC needed to raise 25 steel lattice towers by 10 or 20 feet each to enable the line to operate at its design rating. This paper will communicate the methodology and cost considerations involved in raising existing lattice towers vs. constructing new structures. It will also cover the project's critical path items, and potential improvements. By the end of the paper, readers will learn: Why did we need to raise steel lattice towers? How did we raise the steel lattice towers during construction? What were the key steps that made the project a success?
引用
收藏
页码:249 / 260
页数:12
相关论文
共 50 条
  • [1] Application of weathering steel to steel towers for transmission line
    Nomura, KI
    Yamada, Y
    Kouge, K
    Shiotani, K
    IEEE/PES TRANSMISSION AND DISTRIBUTION CONFERENCE AND EXHIBITION 2002: ASIA PACIFIC, VOLS 1-3, CONFERENCE PROCEEDINGS: NEW WAVE OF T&D TECHNOLOGY FROM ASIA PACIFIC, 2002, : 2154 - 2157
  • [2] AN ASSESSMENT OF STAINLESS STEEL TRANSMISSION LINE TOWERS
    Silva, Geziel
    Silva, Andre
    Vellasco, Pedro
    Lima, Luciano
    STEEL AND ALUMINIUM STRUCTURES, 2016,
  • [3] Modeling of retrofitted steel transmission towers
    Lu, Chenghao
    Ma, Xing
    Mills, Julie E.
    JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH, 2015, 112 : 138 - 154
  • [4] LIGHTNING PERFORMANCE ON TRANSMISSION LINE TOWERS
    Sliskis, Olegs
    Dvornikovs, Ilja
    Ketners, Karlis
    ELECTRICAL AND CONTROL TECHNOLOGIES, 2012, : 157 - 160
  • [5] Failure Analysis of Transmission Line Towers
    Rao, N. Prasad
    Knight, G. M. Samuel
    Seetharaman, S.
    Lakshmanan, N.
    Iyer, Nagesh R.
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2011, 25 (03) : 231 - 240
  • [6] TESTING OF TRANSMISSION LINE TOWERS.
    Murthy, S.S.
    Mukerjea, S.K.
    Indian Journal of Power and River Valley Development, 1973, 23 (05): : 141 - 151
  • [7] DYNAMIC TESTS AND SEISMIC ANALYSES OF HIGH STEEL TOWERS OF ELECTRICAL TRANSMISSION LINE.
    Kotsubo, Seima
    Takanishi, Teruhiko
    Uno, Kiyoshi
    Sonoda, Toshiya
    Transactions of the Japan Society of Civil Engineers, 1985, 15 : 72 - 75
  • [8] DESIGN OF STEEL PILE FOUNDATIONS FOR TRANSMISSION TOWERS
    TENG, WC
    FLUCKER, RL
    GRAHAM, JS
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1970, PA89 (03): : 399 - &
  • [9] A study on weathering steel bolts for transmission towers
    Zeng, Shangwu
    Xu, Delu
    Li, Daijun
    Li, Guang
    Chang, Jianwei
    Fu, Chao
    JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH, 2020, 174 (174)
  • [10] Structural optimization of lattice steel transmission towers
    Couceiro, I.
    Paris, J.
    Martinez, S.
    Colominas, I.
    Navarrina, F.
    Casteleiro, M.
    ENGINEERING STRUCTURES, 2016, 117 : 274 - 286