Risk sharing for PPP project in construction waste recycling industry in China

被引:19
|
作者
Liu, Jingkuang [1 ]
Hua, Zhaowen [1 ]
Pang, Yongshi [1 ]
Wang, Xuetong [1 ]
机构
[1] Guangzhou Univ, Sch Management, Dept Construct Management, Guangzhou Higher Educ Mega Ctr, Guangzhou 510006, Peoples R China
关键词
PPP (public-private partnership); Construction Waste recycling; Risk; System dynamics; PUBLIC-PRIVATE PARTNERSHIP; ENERGY INCINERATION PROJECTS; DEMOLITION WASTE; HONG-KONG; MANAGEMENT;
D O I
10.1007/s11356-021-15816-z
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
With the deepening urbanization, urban renewal, and reconstruction movement in China, a large amount of construction waste has been generated. In order to ease the financial pressure on the government to deal with construction waste, introducing the PPP model in the construction waste recycling industry has become popular. Based on the theory of system dynamics, this paper studies the risks of using the PPP model in construction waste recycling industry. First, a causal loop diagram was depicted according to the interaction of the main risk factors. Then, using the system dynamics software Vensim, a dynamic model of the risks of the PPP project was constructed. The results show the following: (1) the PPP project in the construction waste recycling industry is profitable; (2) For the PPP project in the construction waste recycling industry, the tendering risk will break out in 6 similar to 7 years, the greatest impact on tendering risk is the cooperation environment risk, where cooperation environment risk entropy is increased by 50% and tendering risk entropy is increased by 53.66%; (3) Construction risks will break out in 7 similar to 8 years. The construction cost, construction delay, and design defects have the greatest impact on construction risks, where entropy is increased by 50% and construction risk entropy is increased by 19.30%, 19.25%, and 19.08%, respectively; (4) The operational risk has not broken out in 10 years and is expected to break out in 10 to 20 years. Raw material power supply, production technology level, and operations management efficiency have the greatest impact on operational risk, where entropy is increased by 50% and operational risk entropy is increased by 21.52%, 20.84%, and 20.76%, respectively. These results can provide suggestions and references for the risk management of PPP projects in China's construction waste recycling industry.
引用
收藏
页码:12614 / 12628
页数:15
相关论文
共 50 条
  • [1] Risk sharing for PPP project in construction waste recycling industry in China
    Jingkuang Liu
    Zhaowen Hua
    Yongshi Pang
    Xuetong Wang
    Environmental Science and Pollution Research, 2022, 29 : 12614 - 12628
  • [2] Research on the Risk-Sharing of PPP Financed Project in Construction Industry
    Li, Hong
    Li, Zhongfu
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1-3, 2010, : 706 - 709
  • [3] Risk allocation and benefit distribution of PPP projects for construction waste recycling: a case study of China
    Wang, Zhenshuang
    Zhou, Yanxin
    Jin, Xiaohua
    Zhao, Ning
    Sun, Jianshu
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (09) : 3927 - 3956
  • [4] A Recycling Review of Construction Waste in China's Road Construction Industry
    Yang, Yanmei
    Wei, Shiqiang
    MATERIALS SCIENCE AND INFORMATION TECHNOLOGY, PTS 1-8, 2012, 433-440 : 1945 - +
  • [5] Key policies to the development of construction and demolition waste recycling industry in China
    Li, Jingru
    Yao, Yun
    Zuo, Jian
    Li, Jinggang
    WASTE MANAGEMENT, 2020, 108 (108) : 137 - 143
  • [6] System dynamic analysis of construction waste recycling industry chain in China
    Liu, Jingkuang
    Teng, Yue
    Wang, Dong
    Gong, Enqin
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2020, 27 (30) : 37260 - 37277
  • [7] System dynamic analysis of construction waste recycling industry chain in China
    Jingkuang Liu
    Yue Teng
    Dong Wang
    Enqin Gong
    Environmental Science and Pollution Research, 2020, 27 : 37260 - 37277
  • [8] Recycling and reuse of waste in the construction industry
    Cardiff University
    Struct Eng, 2008, 4 (32-37):
  • [9] RECYCLING ASH PRODUCTION WASTE IN THE CONSTRUCTION INDUSTRY
    Kalinina, E.
    Vaisman, Ya.
    Rudakova, L.
    12th International Multidisciplinary Scientific Geoconference, SGEM 2012, Vol. IV, 2012, : 753 - 759
  • [10] The Construction Project PPP Risk Distribution Study
    Yang Chenhui
    PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON MODERN MANAGEMENT, EDUCATION TECHNOLOGY, AND SOCIAL SCIENCE (MMETSS 2016), 2016, 91 : 68 - 70