Cross-organization process integration in design-build team

被引:16
|
作者
Cheng, Min-Yuan [1 ]
Tsai, Ming-Hsiu [1 ]
机构
[1] Natl Taiwan Univ Sci & Technol, Dept Construct Engn, Taipei 106, Taiwan
关键词
design-build; fast-track construction; business process reengincering (BPR); virtual enterprise (VE); intelligent agent (IA);
D O I
10.1016/j.autcon.2006.12.002
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Combining the design-build and fast-tracking delivery methods, this study aimed to reengineering the fast-tracking processes across both organizations of designer and constructor, so that fast-tracking processes in the design-build team can span across organizational boundaries and are composed of cooperating workflows executed in different organizations. For this purpose, two subjects are described in this study, namely, (1) fast-tracking model creation, and (2) cross-organizational process reengineering. Consequently, this research addressed a mechanism to facilitate the flexibility of crossorganizational process integration, which may assess alliance of design and construction companies for one design-build project. (c) 2006 Elsevier B.V. All rights reserved.
引用
收藏
页码:151 / 162
页数:12
相关论文
共 50 条
  • [31] Utility assessment of electronic networking technologies for design-build projects
    Abduh, M
    Skibniewski, MJ
    AUTOMATION IN CONSTRUCTION, 2003, 12 (02) : 167 - 183
  • [32] Design and construction coordination problems and planning for design-build project new users
    Chang, Andrew S.
    Shen, Fang-Ying
    Ibbs, William
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2010, 37 (12) : 1525 - 1534
  • [33] Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects
    Lu, Wenxue
    Hua, YuanYuan
    Zhang, SuJuan
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (01) : 118 - 132
  • [34] Innovation outcomes and processes in infrastructure projects - a comparative study of Design-Build and Design-Build-Maintenance contracts
    Larsson, Johan
    Eriksson, Per Erik
    Lingegard, Sofia
    Jarvenpaa, Anna-Therese
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2022, 40 (02) : 142 - 156
  • [35] Risk analysis in fixed-price design-build construction projects
    Öztas, A
    Ökmen, Ö
    BUILDING AND ENVIRONMENT, 2004, 39 (02) : 229 - 237
  • [36] DESIGN-BUILD IN ARCHITECTURAL EDUCATION: MOTIVATIONS, PRACTICES, CHALLENGES, SUCCESSES AND FAILURES
    Canizaro, Vincent B.
    ARCHNET-IJAR INTERNATIONAL JOURNAL OF ARCHITECTURAL RESEARCH, 2012, 6 (03) : 20 - 36
  • [37] The Social Quality of Design-Build: Lessons Learnt from Higher Education
    Schreiber, Franziska
    Noeldeke, Johannes
    Setzen, Gpela
    Kropp, Cordula
    Ley, Astrid
    SUSTAINABILITY, 2022, 14 (17)
  • [38] Using neural network to predict performance of design-build projects in Singapore
    Ling, FYY
    Liu, M
    BUILDING AND ENVIRONMENT, 2004, 39 (10) : 1263 - 1274
  • [39] Examination of communication processes in design-build project delivery in building construction
    Tran, Dai Q.
    Long Duy Nguyen
    Faught, Allen
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (06) : 1319 - 1336
  • [40] Analysis of the Design-Build Delivery Method in Air Force Construction Projects
    Rosner, James W.
    Thal, Alfred E., Jr.
    West, Christopher J.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (08) : 710 - 717