An Optimized Open Pit Mine Application for Limestone Quarry Production Scheduling to Maximize Net Present Value

被引:11
作者
Joshi, Devendra [1 ]
Chithaluru, Premkumar [1 ,2 ]
Singh, Aman [2 ,3 ]
Yadav, Arvind [1 ]
Elkamchouchi, Dalia H. [4 ]
Brenosa, Jose [3 ,5 ]
Anand, Divya [3 ,6 ]
机构
[1] Koneru Lakshmaiah Educ Fdn, Dept CSE, Vaddeswaram 522302, India
[2] Univ Int Iberoamer, Dept Project Management, Campeche 24560, Mexico
[3] Univ Europea Atlantico, Higher Polytech Sch, C Isabel Torres 21, Santander 39011, Spain
[4] Princess Nourah Bint Abdulrahman Univ, Coll Comp & Informat Sci, Dept Informat Technol, POB 84428, Riyadh 11671, Saudi Arabia
[5] Univ Int Iberoamer, Dept Project Management, Arecibo, PR 00613 USA
[6] Lovely Profess Univ, Sch Comp Sci & Engn, Phagwara 144411, Punjab, India
关键词
limestone; cement plant; production planning; blending; mixed integer programming; MODEL;
D O I
10.3390/math10214140
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
This study involves a working limestone mine that supplies limestone to the cement factory. The two main goals of this paper are to (a) determine how long an operating mine can continue to provide the cement plant with the quality and quantity of materials it needs, and (b) explore the viability of combining some limestone from a nearby mine with the study mine limestone to meet the cement plant's quality and quantity goals. These objectives are accomplished by figuring out the maximum net profit for the ultimate pit limit and production sequencing of the mining blocks. The issues were resolved using a branch-and-cut based sequential integer and mixed integer programming problem. The study mine can exclusively feed the cement plant for up to 15 years, according to the data. However, it was also noted that the addition of the limestone from the neighboring mine substantially increased the mine's life (85 years). The findings also showed that, when compared with the production planning formulation that the company is now using, the proposed approach creates 10% more profit. The suggested method also aids in determining the desired desirable quality of the limestone that will be transported from the nearby mine throughout each production stage.
引用
收藏
页数:22
相关论文
共 27 条
[21]   MAXIMAL CLOSURE OF A GRAPH AND APPLICATIONS TO COMBINATORIAL PROBLEMS [J].
PICARD, JC .
MANAGEMENT SCIENCE, 1976, 22 (11) :1268-1272
[22]   The new Fundamental Tree Algorithm for production scheduling of open pit mines [J].
Ramazan, Salih .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 177 (02) :1153-1166
[23]  
Rehman S., 2008, P COMSATS INT C MAN
[24]   A MIXED-INTEGER LINEAR PROGRAMMING (MILP) MODEL FOR SHORT-RANGE PRODUCTION SCHEDULING OF CEMENT QUARRY OPERATIONS [J].
Rehman, Safi Ur ;
Asad, Mohammad Waqar Ali .
ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2010, 27 (03) :315-333
[25]  
Tolwinski B., 1996, IMA Journal of Mathematics Applied in Business and Industry, V7, P247, DOI 10.1093/imaman/7.3.247
[26]   Optimisation of long-term quarry production scheduling under geological uncertainty to supply raw materials to a cement plant [J].
Vu, Trong ;
Bao, Tran ;
Drebenstedt, Carsten ;
Pham, Hien ;
Nguyen, Hoai ;
Nguyen, Duc .
MINING TECHNOLOGY-TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY, 2021, 130 (03) :146-158
[27]  
Whittle J., 1990, SURFACE MINING, V2nd, P470