Time-cost optimization model proposal for construction projects with genetic algorithm and fuzzy logic approach

被引:0
|
作者
Yildirim, Hatice Acar [1 ]
Akcay, Cemil [2 ]
机构
[1] Istanbul Univ, Inst Grad Studies Sci & Engn, TR-34320 Istanbul, Turkey
[2] Istanbul Univ, Fac Architecture, TR-34116 Istanbul, Turkey
来源
REVISTA DE LA CONSTRUCCION | 2019年 / 18卷 / 03期
关键词
Construction project; time-cost optimization; genetic algorithm; fuzzy logic; TRADE-OFF;
D O I
10.7764/RDLC.18.3.554
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Considering the construction industry holds ten percent on average in the gross national product over the world, the importance of efficient use of resources emerges. To alleviate the possibility of the risk factors and various uncertainties' negative impact on the project, the usage of the scheduling tools should be supported for planning as well as risk management. In today's construction perspective, the quality is not a primary objective; construction projects have to be completed within the cost and duration limits. During the construction progress, the inserting of extra activities affects to construction delays. Project success; from the planning stage to the completion of the building, it is possible to plan the resources, use them efficiently, and realize the determined time and cost objectives. In this study, a model is developed by using a fuzzy logic approach and genetic algorithm in order to provide time-cost optimization in construction projects under uncertainties. Firstly, fuzzy sets are used to take into account the effects of time and cost uncertainties on construction works. Fuzzy sets are used to model uncertainties, and the genetic algorithm is used to acquire minimum Project cost and duration. Thus, by establishing a fuzzy time-cost optimization model, optimum time-cost results are obtained according to different risk levels determined by the decision-makers. At the final stage, Pareto fronts from different risk levels that contain both minimum costs and durations are obtained and plotted.
引用
收藏
页码:554 / 567
页数:14
相关论文
共 50 条
  • [41] Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model
    Panwar, Abhilasha
    Jha, Kumar Neeraj
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (02)
  • [42] Optimization of Fuzzy Logic Controller for Trajectory Tracking Using Genetic Algorithm
    Shill, Pintu Chandra
    Akhand, M. A. H.
    Amin, Md Faijul
    Murase, Kazuyuki
    JOURNAL OF ADVANCED COMPUTATIONAL INTELLIGENCE AND INTELLIGENT INFORMATICS, 2011, 15 (06) : 639 - 651
  • [43] Optimization of indoor thermal comfort values with fuzzy logic and genetic algorithm
    Balci, Sonay Gorgulu
    Ersoz, Suleyman
    Luy, Murat
    Turker, Ahmet Kursad
    Barisci, Necaattin
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2023, 45 (02) : 2305 - 2317
  • [44] Multiproject Time-cost Trade-off Scheduling Problem for Large-scale Construction Systems under Fuzzy Uncertainty
    Ouyang Yong-liu
    Zhang Meng-xiang
    Han Lu
    Lu Yi
    2015 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING - 22ND ANNUAL CONFERENCE PROCEEDINGS, VOLS I AND II, 2015, : 282 - 292
  • [45] FUZZY GENETIC ALGORITHM MODEL FOR OPTIMIZATION OF AUTOMATED GUIDED VEHICLE SCHEDULING
    Badakhshian, Mostafa
    Sulaiman, Shamsuddin B.
    Ariffin, Mohd Khairol Anuar B.
    PROCEEDINGS OF THE 38TH INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2008, : 1791 - 1797
  • [46] Multi-objective Genetic Algorithm for the Time, Cost, and Quality Trade-Off Analysis in Construction Projects
    Bragadin, Marco Alvise
    Pozzi, Luca
    Kahkonen, Kalle
    SDGS IN CONSTRUCTION ECONOMICS AND ORGANIZATION, CREON 2022, 2023, : 193 - 207
  • [47] Resource Constrained Time-cost Trade-off Problem and its Genetic Algorithm Solution
    Feng, Yixiong
    Lin, Xiaohua
    Tan, Jianrong
    APPLIED MATHEMATICS & INFORMATION SCIENCES, 2013, 7 (02): : 639 - 643
  • [48] Modeling and Optimization of Membrane Chemical Cleaning by Artificial Neural Network, Fuzzy Logic, and Genetic Algorithm
    Madaeni, S. S.
    Hasankiadeh, N. Tavajohi
    Tavakolian, H. R.
    CHEMICAL ENGINEERING COMMUNICATIONS, 2012, 199 (03) : 399 - 416
  • [49] Multi-objective time-cost trade-off optimization for the construction scheduling with Rao algorithms
    Yilmaz, Mehmet
    Dede, Tayfun
    STRUCTURES, 2023, 48 : 798 - 808
  • [50] Optimizing time-cost trade-offs in product development projects with a multi-objective evolutionary algorithm
    Meier, Christoph
    Yassine, Ali A.
    Browning, Tyson R.
    Walter, Ulrich
    RESEARCH IN ENGINEERING DESIGN, 2016, 27 (04) : 347 - 366