Time-cost optimization model proposal for construction projects with genetic algorithm and fuzzy logic approach

被引:0
|
作者
Yildirim, Hatice Acar [1 ]
Akcay, Cemil [2 ]
机构
[1] Istanbul Univ, Inst Grad Studies Sci & Engn, TR-34320 Istanbul, Turkey
[2] Istanbul Univ, Fac Architecture, TR-34116 Istanbul, Turkey
来源
REVISTA DE LA CONSTRUCCION | 2019年 / 18卷 / 03期
关键词
Construction project; time-cost optimization; genetic algorithm; fuzzy logic; TRADE-OFF;
D O I
10.7764/RDLC.18.3.554
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Considering the construction industry holds ten percent on average in the gross national product over the world, the importance of efficient use of resources emerges. To alleviate the possibility of the risk factors and various uncertainties' negative impact on the project, the usage of the scheduling tools should be supported for planning as well as risk management. In today's construction perspective, the quality is not a primary objective; construction projects have to be completed within the cost and duration limits. During the construction progress, the inserting of extra activities affects to construction delays. Project success; from the planning stage to the completion of the building, it is possible to plan the resources, use them efficiently, and realize the determined time and cost objectives. In this study, a model is developed by using a fuzzy logic approach and genetic algorithm in order to provide time-cost optimization in construction projects under uncertainties. Firstly, fuzzy sets are used to take into account the effects of time and cost uncertainties on construction works. Fuzzy sets are used to model uncertainties, and the genetic algorithm is used to acquire minimum Project cost and duration. Thus, by establishing a fuzzy time-cost optimization model, optimum time-cost results are obtained according to different risk levels determined by the decision-makers. At the final stage, Pareto fronts from different risk levels that contain both minimum costs and durations are obtained and plotted.
引用
收藏
页码:554 / 567
页数:14
相关论文
共 50 条
  • [31] Optimization of Waypoints on the Great Circle Route Based on Genetic Algorithm and Fuzzy Logic
    Hsieh, Tsung-Hsuan
    Meng, Qian
    Han, Bing
    Wang, Shengzheng
    Wu, Xuezhen
    JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2023, 11 (02)
  • [32] An integrated multi-objective optimization model for solving the construction time-cost trade-off problem
    Koo, Choongwan
    Hong, Taehoon
    Kim, Sangbum
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2015, 21 (03) : 323 - 333
  • [33] A time-cost trade-off model by incorporating fuzzy earned value management: A statistical based approach
    Salari, Mostafa
    Bagherpour, Morteza
    Reihani, Mohammad Hossein
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2015, 28 (04) : 1909 - 1919
  • [34] Fuzzy Based Project Time-Cost Optimization Using Simulated Annealing Search Technique
    Haque, Khan Md. Ariful
    Hasin, M. Ahsan Akhtar
    INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY PROJECT MANAGEMENT, 2014, 5 (01) : 90 - 103
  • [35] Novel Hybrid Method in Time-Cost Trade-Off for Resource-Constrained Construction Projects
    Albayrak, Gulcag
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2020, 44 (04) : 1295 - 1307
  • [36] Time-cost trade-off optimization with a new initial population approach
    Toğan V.
    Eirgash M.A.
    Teknik Dergi/Technical Journal of Turkish Chamber of Civil Engineers, 2019, 30 (06): : 9561 - 9580
  • [37] Algorithm for blinds control based on the optimization of blind tilt angle using a genetic algorithm and fuzzy logic
    Congradac, Velimir
    Prica, Marta
    Paspalj, Marija
    Bojanic, Dubravka
    Capko, Darko
    SOLAR ENERGY, 2012, 86 (09) : 2762 - 2770
  • [38] Modeling a Conceptual framework for owner- contractor relationship and time-cost trade-off using fuzzy logic technique
    Al Hazza, Muataz Hazza F.
    Al Fadel, Mohammad
    Adesta, Erry Yulian Triblas
    3RD INTERNATIONAL CONFERENCE ON ADVANCED COMPUTER SCIENCE APPLICATIONS AND TECHNOLOGIES ACSAT 2014, 2014, : 179 - 183
  • [39] A Genetic Algorithm and Fuzzy Approach (GAFA) for Constrained Nonlinear Optimization in Design
    Bhuvaneshwaran, Vijayakumar
    Langari, Reza
    Temponi, Cecilia
    INTERNATIONAL JOURNAL FOR COMPUTATIONAL METHODS IN ENGINEERING SCIENCE & MECHANICS, 2006, 7 (03) : 173 - 189
  • [40] Combining Fuzzy Logic and Genetic Algorithms to Optimize Cost, Time and Quality in Modern Agriculture
    Erdogdu, Aylin
    Dayi, Faruk
    Yildiz, Ferah
    Yanik, Ahmet
    Ganji, Farshad
    SUSTAINABILITY, 2025, 17 (07)