Time-cost optimization model proposal for construction projects with genetic algorithm and fuzzy logic approach

被引:0
|
作者
Yildirim, Hatice Acar [1 ]
Akcay, Cemil [2 ]
机构
[1] Istanbul Univ, Inst Grad Studies Sci & Engn, TR-34320 Istanbul, Turkey
[2] Istanbul Univ, Fac Architecture, TR-34116 Istanbul, Turkey
来源
REVISTA DE LA CONSTRUCCION | 2019年 / 18卷 / 03期
关键词
Construction project; time-cost optimization; genetic algorithm; fuzzy logic; TRADE-OFF;
D O I
10.7764/RDLC.18.3.554
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Considering the construction industry holds ten percent on average in the gross national product over the world, the importance of efficient use of resources emerges. To alleviate the possibility of the risk factors and various uncertainties' negative impact on the project, the usage of the scheduling tools should be supported for planning as well as risk management. In today's construction perspective, the quality is not a primary objective; construction projects have to be completed within the cost and duration limits. During the construction progress, the inserting of extra activities affects to construction delays. Project success; from the planning stage to the completion of the building, it is possible to plan the resources, use them efficiently, and realize the determined time and cost objectives. In this study, a model is developed by using a fuzzy logic approach and genetic algorithm in order to provide time-cost optimization in construction projects under uncertainties. Firstly, fuzzy sets are used to take into account the effects of time and cost uncertainties on construction works. Fuzzy sets are used to model uncertainties, and the genetic algorithm is used to acquire minimum Project cost and duration. Thus, by establishing a fuzzy time-cost optimization model, optimum time-cost results are obtained according to different risk levels determined by the decision-makers. At the final stage, Pareto fronts from different risk levels that contain both minimum costs and durations are obtained and plotted.
引用
收藏
页码:554 / 567
页数:14
相关论文
共 50 条
  • [21] Obsolescence Risk Optimization Using Fuzzy Logic and Genetic Algorithm
    Esfahani, Amir Kouhpayehzadeh
    Darbeheshty, Behzad
    Esfahani, Sedigheh Kouhpayehzadeh
    Niknafs, Ali Akbar
    2013 FOURTH INTERNATIONAL CONFERENCE ON COMPUTING, COMMUNICATIONS AND NETWORKING TECHNOLOGIES (ICCCNT), 2013,
  • [22] A Fuzzy Random Time-Cost Trade-off Model
    Ke, Hua
    Ma, Weimin
    PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 633 - 637
  • [23] Time-Cost Trade-Off Optimization with a New Initial Population Approach
    Togan, Vedat
    Eirgas, Mohammad Azim
    TEKNIK DERGI, 2019, 30 (06): : 9561 - 9580
  • [24] A fuzzy logic approach to model delays in construction projects using rotational fuzzy fault tree models
    Al-Humaidi, H. M.
    Tan, F. Hadipriono
    CIVIL ENGINEERING AND ENVIRONMENTAL SYSTEMS, 2010, 27 (04) : 329 - 351
  • [25] Optimizing of Discrete Time-Cost in Construction Projects Using New Adaptive Weight Formulations
    Vedat Toğan
    Neslihan Berberoğlu
    Tayfun Dede
    KSCE Journal of Civil Engineering, 2022, 26 : 511 - 521
  • [26] Scheduling Optimization of Prefabricated Construction Projects by Genetic Algorithm
    Xie, Linlin
    Chen, Yajiao
    Chang, Ruidong
    APPLIED SCIENCES-BASEL, 2021, 11 (12):
  • [27] Tradeoff time cost quality in repetitive construction project using fuzzy logic approach and symbiotic organism search algorithm
    Nguyen, Dang-Trinh
    Le-Hoai, Long
    Tarigan, Putri Basenda
    Tran, Duc-Hoc
    ALEXANDRIA ENGINEERING JOURNAL, 2022, 61 (02) : 1499 - 1518
  • [28] Assessment of cost overrun factors in construction projects in Nigeria using fuzzy logic
    Jude Iloabuchi Obianyo
    Okey Enangha Okey
    George Uwadiegwu Alaneme
    Innovative Infrastructure Solutions, 2022, 7
  • [29] Cost Control Management of Construction Projects Based on Fuzzy Logic and Auction Theory
    Zeng, Zhao
    Gao, Ying
    IEEE ACCESS, 2024, 12 : 130292 - 130304
  • [30] Assessment of cost overrun factors in construction projects in Nigeria using fuzzy logic
    Obianyo, Jude Iloabuchi
    Okey, Okey Enangha
    Alaneme, George Uwadiegwu
    INNOVATIVE INFRASTRUCTURE SOLUTIONS, 2022, 7 (05)