Cyclic scheduling heuristics for a re-entrant job shop manufacturing environment

被引:8
|
作者
Aldakhilallah, KA
Ramesh, R
机构
[1] King Saud Univ, Coll Business & Econ, Dept Quantitat Methods, Al Molaida Qassim 81888, Saudi Arabia
[2] SUNY Buffalo, Sch Management, Dept Management Syst & Sci, Buffalo, NY 14260 USA
关键词
D O I
10.1080/00207540110047711
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Two efficient cyclic scheduling heuristics for re-entrant job shop environments were developed. Each heuristic generated an efficient and feasible cyclic production schedule for a job shop in which a single product was produced repetitively on a set of machines was to determine an efficient and feasible cyclic schedule which simultaneously minimized flow time and cycle time. The first heuristic considered a repetitive production re-entrant job shop with a predetermined sequence of operations on a single product with known processing times, set-up and material handling times. The second heuristic was a specialization of the first heuristic where the set-up for an operation could commence even while the preceding operation was in progress. These heuristics have been extensively tested and computational results are provided. Also, extensive analysis of worst-case and trade-offs between cycle time and flow time are provided. The results indicate that the proposed heuristics are robust and yield efficient and superior cyclic schedules with modest computational effort.
引用
收藏
页码:2635 / 2657
页数:23
相关论文
共 50 条
  • [31] A Lot Streaming Model for a Re-entrant Flow Shop Scheduling Problem with Missing Operations
    Hinze, Richard
    LOGISTICS MANAGEMENT, 2016, : 149 - 158
  • [32] Re-entrant manufacturing system scheduling based on Drum-Buffer-Rope
    Cao, Zheng-Cai
    Peng, Ya-Zhen
    Wu, Qi-Di
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (12): : 2668 - 2673
  • [33] A Heuristic for Variable Re-Entrant Scheduling Problems
    van der Tempel, Roel
    van Pinxten, Joost
    Geilen, Marc
    Waqas, Umar
    2018 21ST EUROMICRO CONFERENCE ON DIGITAL SYSTEM DESIGN (DSD 2018), 2018, : 336 - 341
  • [34] Continuous Modeling of Re-entrant Manufacturing Systems
    He, Fenglan
    Dong, Ming
    Wu, Zhigang
    MANUFACTURING PROCESSES AND SYSTEMS, PTS 1-2, 2011, 148-149 : 595 - +
  • [35] Control of manufacturing systems with re-entrant lines
    Nikitin, S
    MATHEMATICAL MODELS & METHODS IN APPLIED SCIENCES, 1996, 6 (02): : 195 - 215
  • [36] Re-Entrant Green Scheduling Problem of Bearing Production Shops Considering Job Reworking
    Wang, Yansen
    Shi, Jianwei
    Wang, Wenjie
    Li, Cheng
    MACHINES, 2024, 12 (04)
  • [37] Line Balancing Strategy for Re-Entrant Manufacturing
    Yoon, Sungwook
    Jeong, Sukjae
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2018, 31 (01) : 42 - 51
  • [38] Green re-entrant hybrid flow shop scheduling problem considering multiple time factors
    Geng K.
    Ye C.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2023, 29 (01): : 75 - 90
  • [39] Study on re-entrant flow-shop scheduling problem (optimization by mixed integer programming)
    Hino, R. (hino@mech.nagoya-u.ac.jp), 1600, Japan Society of Mechanical Engineers (79):
  • [40] Proactive maintenance scheduling in a re-entrant flow shop using Lagrangian decomposition coordination method
    Kaihara, T.
    Fujii, N.
    Tsujibe, A.
    Nonaka, Y.
    CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2010, 59 (01) : 453 - 456