共 50 条
- [31] A Lot Streaming Model for a Re-entrant Flow Shop Scheduling Problem with Missing Operations LOGISTICS MANAGEMENT, 2016, : 149 - 158
- [32] Re-entrant manufacturing system scheduling based on Drum-Buffer-Rope Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (12): : 2668 - 2673
- [33] A Heuristic for Variable Re-Entrant Scheduling Problems 2018 21ST EUROMICRO CONFERENCE ON DIGITAL SYSTEM DESIGN (DSD 2018), 2018, : 336 - 341
- [34] Continuous Modeling of Re-entrant Manufacturing Systems MANUFACTURING PROCESSES AND SYSTEMS, PTS 1-2, 2011, 148-149 : 595 - +
- [35] Control of manufacturing systems with re-entrant lines MATHEMATICAL MODELS & METHODS IN APPLIED SCIENCES, 1996, 6 (02): : 195 - 215
- [38] Green re-entrant hybrid flow shop scheduling problem considering multiple time factors Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2023, 29 (01): : 75 - 90
- [39] Study on re-entrant flow-shop scheduling problem (optimization by mixed integer programming) Hino, R. (hino@mech.nagoya-u.ac.jp), 1600, Japan Society of Mechanical Engineers (79):