Cyclic scheduling heuristics for a re-entrant job shop manufacturing environment

被引:8
|
作者
Aldakhilallah, KA
Ramesh, R
机构
[1] King Saud Univ, Coll Business & Econ, Dept Quantitat Methods, Al Molaida Qassim 81888, Saudi Arabia
[2] SUNY Buffalo, Sch Management, Dept Management Syst & Sci, Buffalo, NY 14260 USA
关键词
D O I
10.1080/00207540110047711
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Two efficient cyclic scheduling heuristics for re-entrant job shop environments were developed. Each heuristic generated an efficient and feasible cyclic production schedule for a job shop in which a single product was produced repetitively on a set of machines was to determine an efficient and feasible cyclic schedule which simultaneously minimized flow time and cycle time. The first heuristic considered a repetitive production re-entrant job shop with a predetermined sequence of operations on a single product with known processing times, set-up and material handling times. The second heuristic was a specialization of the first heuristic where the set-up for an operation could commence even while the preceding operation was in progress. These heuristics have been extensively tested and computational results are provided. Also, extensive analysis of worst-case and trade-offs between cycle time and flow time are provided. The results indicate that the proposed heuristics are robust and yield efficient and superior cyclic schedules with modest computational effort.
引用
收藏
页码:2635 / 2657
页数:23
相关论文
共 50 条
  • [1] Cyclic scheduling for re-entrant manufacturing systems
    Yura, K
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1999, 60-1 : 523 - 528
  • [2] Modelling and Simulation of Re-Entrant Flow Shop Scheduling: An Application in Semiconductor Manufacturing
    El-Khouly, Ingy A.
    El-Kilany, Khaled S.
    El-Sayed, Aziz E.
    CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 211 - 216
  • [3] A model for a Special Re-entrant Flow Shop Scheduling
    Cai, Yue
    Wang, Jian
    Li, Hua
    2010 INTERNATIONAL CONFERENCE ON INFORMATION, ELECTRONIC AND COMPUTER SCIENCE, VOLS 1-3, 2010, : 1887 - 1891
  • [4] An improved genetic algorithm for the re-entrant and flexible job-shop scheduling problem
    Zhang Mei
    Wu Kaihua
    PROCEEDINGS OF THE 28TH CHINESE CONTROL AND DECISION CONFERENCE (2016 CCDC), 2016, : 3399 - 3404
  • [5] Integer programming models for the re-entrant shop scheduling problems
    Chen, Jen-Shiang
    Pan, Jason Chao-Hsien
    ENGINEERING OPTIMIZATION, 2006, 38 (05) : 577 - 592
  • [6] Mathematical modelling of multi-objective job shop scheduling with dependent setups and re-entrant operations
    Low, C. (chinyao@mail.dyu.edu.tw), 1600, Springer-Verlag London Ltd (27): : 1 - 2
  • [7] Mathematical modelling of multi-objective job shop scheduling with dependent setups and re-entrant operations
    Low, CY
    Wu, TH
    Hsu, CM
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2005, 27 (1-2): : 181 - 189
  • [8] Mathematical modelling of multi-objective job shop scheduling with dependent setups and re-entrant operations
    Chinyao Low
    Tai-Hsi Wu
    Chih-Ming Hsu
    The International Journal of Advanced Manufacturing Technology, 2005, 27 : 181 - 189
  • [9] A heuristic algorithm for two-machine re-entrant shop scheduling
    Drobouchevitch, IG
    Strusevich, VA
    ANNALS OF OPERATIONS RESEARCH, 1999, 86 (0) : 417 - 439
  • [10] Application of visualized simulation in scheduling re-entrant manufacturing system
    Lu, Wen-Yan
    Dang, Yan-Zhong
    2003, Acta Simulata Systematica Sinica (15):