Design of reverse osmosis desalination plant in Puerto Penasco, Sonora, Mexico

被引:12
|
作者
Robles-Lizarraga, Adriana [1 ]
del Rosario Martinez-Macias, Maria [1 ]
Isela Encinas-Guzman, Maria [1 ]
de Jesus Larraguibel-Aganza, Oscar [1 ]
Rodriguez-Lopez, Jorge [1 ]
Eduardo Devora-Isiordia, German [1 ]
机构
[1] Inst Tecnol Sonora, 5 Febrero Sur, Obregon 85000, Sonora, Mexico
关键词
Desalination; IMSDesign; Reverse osmosis; Scarcity; Water stress; WATER;
D O I
10.5004/dwt.2020.24739
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Water scarcity slows down economical and industrial development, and population growth. Desalination by reverse osmosis is a separation process used to reduce the dissolved salt content of saline water to a usable level and offer one solution alternative to this problem. The use of simulators allows to obtain the optimal design in water production and energy consumption. The objective of this study was to select the operation conditions using the IMSDesign simulator, to provide a solution to water scarcity and satisfy the demand of population of Puerto Penasco, Mexico, with projection by the year 2040. Data entry, such as water quality, membrane modules, economic data and chemical costs were considered. Different membrane modules (SWC4-LD, SWC4-MAX, SWC5-MAX and SWC6-MAX) were tested in the design. Six different arrays were tested to each module. A design was considered optimal when the lowest energy consumption (kWh/m(3)), lowest investment cost ($USD/m(3)) and the highest elimination of contaminants (%) were obtained according to the concentration parameters (mg/L) established by the Mexican Norm (NOM-127-SSA1-1994) and the World Health Organization. The membrane module and array that complied with these conditions were SWC6-MAX with mixed permeate and energy recovery device. The results obtained were water permeate of $0.49 USD/m(3) and energy demand of 1.91 kWh/m(3). The simulation of a desalination process allows defining the operating condition and membrane type, at the same time, it reduces the operation and investment cost and increases the probability of solving water scarcity in Puerto Penasco.
引用
收藏
页码:1 / 10
页数:10
相关论文
共 50 条
  • [11] Optimization of the preliminary treatment in a desalination plant by reverse osmosis
    Tlili, MM
    Manzola, AS
    Ben Amor, M
    DESALINATION, 2003, 156 (1-3) : 69 - 78
  • [12] Exergy analysis of a reverse osmosis desalination plant in California
    Cerci, Y
    DESALINATION, 2002, 142 (03) : 257 - 266
  • [13] Environmental implications of Tajoura reverse osmosis desalination plant
    Brika, Bashir
    DESALINATION AND WATER TREATMENT, 2016, 57 (46) : 21712 - 21720
  • [14] MEMBRANE FOULING IN REVERSE OSMOSIS DESALINATION PLANT.
    Raval, M.K.
    Chandorikar, M.V.
    1600, (27):
  • [15] Performance of reverse osmosis desalination plant in rural area
    Shah, V.J.
    Kava, R.M.
    Devmurari, C.V.
    Rao, A.V.
    Research and Industry, 1993, 38 (01):
  • [16] Provenance and tectonic settings of sands from Puerto Penasco, Desemboque and Bahia Kino beaches, Gulf of California, Sonora, Mexico
    Madhavaraju, J.
    Tom, Milu
    Lee, Yong Il
    Balaram, V.
    Ramasamy, S.
    Carranza-Edwards, A.
    Ramachandran, A.
    JOURNAL OF SOUTH AMERICAN EARTH SCIENCES, 2016, 71 : 262 - 275
  • [17] Reverse osmosis desalination
    Abdella, Dana L.
    Marine Technology and SNAME News, 1994, 31 (03): : 195 - 200
  • [18] DESALINATION BY REVERSE OSMOSIS
    SHERWOOD, TK
    BRIAN, PLT
    FISHER, RE
    INDUSTRIAL & ENGINEERING CHEMISTRY FUNDAMENTALS, 1967, 6 (01): : 2 - +
  • [19] Optimal Design of a Hybrid Renewable Power System for a Reverse Osmosis Desalination Plant in Jordan
    Ababneh, Sara N.
    Al-Odat, Mohammad
    JOURNAL OF ECOLOGICAL ENGINEERING, 2024, 25 (07): : 384 - 397
  • [20] Design of Monitoring and Scheduling System for a Large-scale Reverse Osmosis Desalination Plant
    Wang Jian
    Wang Xiaolong
    Niu Zhiyuan
    Shu, Jiangzhou
    Jiang Aipeng
    Li Ping
    2013 32ND CHINESE CONTROL CONFERENCE (CCC), 2013, : 2480 - 2485