A genetic algorithm approach to a general category project scheduling problem

被引:116
|
作者
Özdamar, L [1 ]
机构
[1] Istanbul Kultur Univ, Dept Comp Engn, TR-80280 Istanbul, Turkey
来源
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART C-APPLICATIONS AND REVIEWS | 1999年 / 29卷 / 01期
关键词
genetic algorithms; heuristic knowledge; resource-constrained project scheduling;
D O I
10.1109/5326.740669
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
A genetic algorithm (GA) approach is proposed for the general resource constrained project scheduling model, in which activities may be executed in more than one operating mode and renewable as well as nonrenewable resource constraints exist, Each activity operation mode has a different duration and requires different amounts of renewable and nonrenewable resources. The objective is the minimization of the project duration or makespan, The problem under consideration is known to be one of the most difficult scheduling problems, and it is hard to find a feasible solution for such a problem, let alone the optimal one, The GA approach described here incorporates problem-specific scheduling knowledge by an indirect chromosome encoding that consists of selected activity operating modes and an ordered set of scheduling rules, The scheduling rules in the chromosome are used in an iterative scheduling algorithm that constructs the schedule resulting from the chromosome. The proposed GA is denoted as a hybrid GA (HGA) approach since it is integrated with traditional scheduling tools and expertise specifically developed for the general resource constrained project scheduling problem. The results demonstrate that HGA approach produces near-optimal solutions within a reasonable amount of computation time.
引用
收藏
页码:44 / 59
页数:16
相关论文
共 50 条
  • [31] Improved genetic algorithm for the permutation flowshop scheduling problem
    Iyer, SK
    Saxena, B
    COMPUTERS & OPERATIONS RESEARCH, 2004, 31 (04) : 593 - 606
  • [32] A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem
    Zamani, Reza
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2013, 229 (02) : 552 - 559
  • [33] An indirect Genetic Algorithm for a nurse-scheduling problem
    Aickelin, U
    Dowsland, KA
    COMPUTERS & OPERATIONS RESEARCH, 2004, 31 (05) : 761 - 778
  • [34] An Effective Memetic Algorithm for Resource Constrained Project Scheduling Problem
    Rahman, Humyun Fuad
    Chakrabortty, Ripon Kumar
    Ryan, Michael J.
    2019 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2019, : 2160 - 2166
  • [35] Application of genetic algorithm to the technological operations scheduling problem
    Lujic, R.
    Saric, T.
    Simunovic, G.
    METALURGIJA, 2008, 47 (02): : 103 - 107
  • [36] A genetic algorithm for optimal resource-driven project scheduling
    Kaiafa, Sofia
    Chassiakos, Athanasios P.
    CREATIVE CONSTRUCTION CONFERENCE 2015, SELECTED PAPERS, 2015, 123 : 260 - 267
  • [37] A competitive genetic algorithm for resource-constrained project scheduling
    Hartmann, S
    NAVAL RESEARCH LOGISTICS, 1998, 45 (07) : 733 - 750
  • [38] An efficient genetic programming approach to design priority rules for resource-constrained project scheduling problem
    Luo, Jingyu
    Vanhoucke, Mario
    Coelho, Jose
    Guo, Weikang
    EXPERT SYSTEMS WITH APPLICATIONS, 2022, 198
  • [39] A genetic algorithm approach for the single machine scheduling problem with linear earliness and quadratic tardiness penalties
    Valente, Jorge M. S.
    Goncalves, Jose Fernando
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (10) : 2707 - 2715
  • [40] A hybrid genetic algorithm based on intelligent encoding for project scheduling
    Alcaraz, J.
    Maroto, C.
    IMECS 2007: INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTISTS, VOLS I AND II, 2007, : 2264 - +