Status of Superconducting Cable Demonstration Project in Japan

被引:53
作者
Honjo, Shoichi [1 ]
Mimura, Tomoo [1 ]
Kitoh, Yutaka [1 ]
Noguchi, Yu [1 ]
Masuda, Takato [2 ]
Yumura, Hiroyasu [2 ]
Watanabe, Michihiko [2 ]
Ikeuchi, Masamitsu [3 ]
Yaguchi, Hiroharu [3 ]
Hara, Tsukushi [4 ]
机构
[1] Tokyo Elect Power Co Ltd, Yokohama, Kanagawa 2308510, Japan
[2] Sumitomo Elect Ind Ltd, Osaka 5540024, Japan
[3] Mayekawa MFG Co Ltd, Moriya 3020118, Japan
[4] Tokyo Elect Power Co Ltd, Tokyo 1008560, Japan
关键词
High-temperature superconductors; power cables; superconducting cables; superconducting transmission lines;
D O I
10.1109/TASC.2010.2092744
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The HTS cable demonstration project, called the Yokohama Project, supported by Ministry of Economy, Trade and Industry and the New Energy and Industrial Technology Development Organization, was initiated in Japan in 2007. The aim of this project is to operate a 66 kV, 200 MVA high-temperature superconducting (HTS) cable in a network of the Tokyo Electric Power Company to demonstrate cable reliability and stable operation. Total project period was changed from 5 years to 6 years. Chosen as the demonstration site was the Asahi substation in Yokohama. Based on the analysis of the network conditions of the demonstration site, specifications of the HTS cable system were determined. Element technologies were developed and various preliminary tests using short core samples were conducted to confirm the HTS cable design. A 30-meter HTS cable system was manufactured and tested prior to initial demonstration tests. Long-term demonstration tests of the HTS cable system in an actual grid at the Asahi substation are scheduled to be started in 2011.
引用
收藏
页码:967 / 971
页数:5
相关论文
共 8 条
[1]  
FURUSE M, 2010, IEEE T APPL SU UNPUB
[2]  
LINDSAY D, CIGRE 2008, pB1
[3]   Installation and Testing Results of Long Island Transmission Level HTS Cable [J].
Maguire, James F. ;
Schmidt, Frank ;
Bratt, Shawn ;
Welsh, Tom E. ;
Yuan, Jie .
IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2009, 19 (03) :1692-1697
[4]  
MASUDA T, 2010, IEEE T APPL SUPERCON
[5]  
Ohya Masayoshi, 2010, SEI Technical Review, P84
[6]  
WATANABE M, 2010, ICEC UNPUB
[7]   Long Term Performance Test of KEPCO HTS Power Cable [J].
Yang, Hyung Suk ;
Kim, Dong Lak ;
Sohn, Song Ho ;
Lim, Ji Hyun ;
Choi, Ha Ok ;
Choi, Yeon Suk ;
Lee, Byoung Seob ;
Jung, Won Moog ;
Ryoo, Hee Suk ;
Hwang, Si Dole .
IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2009, 19 (03) :1782-1784
[8]  
Yumura Hiroyasu, 2009, SEI Technical Review, P69