Impact of three-dimensional parametric modeling of buildings on productivity in structural engineering practice

被引:88
作者
Sacks, Rafael [1 ]
Barak, Ronen [1 ]
机构
[1] Technion Israel Inst Technol, Fac Civil & Env Engn, IL-32000 Haifa, Israel
关键词
computer aided design; reinforced concrete; productivity; structural engineering; three-dimensional models;
D O I
10.1016/j.autcon.2007.08.003
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The transition from two-dimensional drafting to three dimensional modeling of building structures is likely to influence structural engineering design practices in numerous ways. The immediate impact in the early stages of adoption in any design practice will be an increase in productivity in design documentation. On the basis of a benchmark of hours for structural engineering design and detailing of reinforced concrete building structures, and two sets of three-dimensional modeling experiments, the potential productivity gain is conservatively estimated to be in the range from 15% and 41% of the hours required for a project due to improvements in drawing production alone. Unlike two dimensional computer-aided drafting, parametric three dimensional modeling is particularly useful at the early stages of design, where engineering skills are required. Both these effects point to an expected decline in the number of drafting staff in proportion to engineering staff. While overall hours expended will decrease, engineers may account for a greater share of the overall workload, or a new professional role - the structural modeler - may emerge. (C) 2007 Elsevier B.V. All rights reserved.
引用
收藏
页码:439 / 449
页数:11
相关论文
共 28 条
[1]  
*2002 EC CENS, 2004, PROF SCI TECHN SERV
[2]  
ANDRESEN J, 2000, J INF TECHNOL, V4, P57
[3]  
[Anonymous], PROJECT MANAGEMENT J
[4]  
Chang L. M., 2001, ENG PRODUCTIVITY MEA
[5]  
DUFFY AHB, 1998, DESIGN PRODUCTIVITY
[6]  
EASTMAN CM, 2008, HDB GUIDE BUILDING I, P450
[7]   A fuzzy expert system for design performance prediction and evaluation [J].
Fayek, A ;
Sun, Z .
CANADIAN JOURNAL OF CIVIL ENGINEERING, 2001, 28 (01) :1-25
[8]  
Flanagan R., 2000, Eng. Construct. Architect. Manag., V7, P423, DOI DOI 10.1108/EB021164
[9]  
Johnson R. E., 1998, Automation in Construction, V8, P3, DOI 10.1016/S0926-5805(98)00061-2
[10]  
KHEMLANI L, 2004, AUTODESK REVIT IMPLE, P19