Enhancements to the FAA ground-delay program under collaborative decision making

被引:42
作者
Chang, K
Howard, K
Oiesen, R
Shisler, L
Tanino, M
Wambsganss, MC
机构
[1] Metron Inc, Reston, VA 20190 USA
[2] Volpe Natl Transportat Syst Ctr, DTS 920, Cambridge, MA 02142 USA
关键词
industries; transportation; shipping information systems; decision support systems;
D O I
10.1287/inte.31.1.57.9689
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
When airport arrival capacity is reduced, it may not meet the demand placed by arriving aircraft. In these cases, the FAA enacts a ground-delay program (GDP) to delay flights before they depart from their origin airports, keeping traffic at an acceptable level for the affected arrival airport. However, air-traffic managers sometimes lacked current data and a common situational awareness when running a GDP. Working with the FAA and the airline community, Metron, Inc. and Volpe National Transportation Systems Center improved the process by using real-time data exchange between all users, new algorithms to assign flight-arrival slots, and new software at FAA facilities and airlines. This paper reflects the views and opinions of the authors and does not necessarily reflect that of the FAA.
引用
收藏
页码:57 / 76
页数:20
相关论文
共 10 条
  • [1] BALL MO, 2000, COLLABORATIVE DECISI
  • [2] Barnhart C., 1999, ORMS TODAY, V26, P32
  • [3] *FAA, 1994, 200940 FAAAOR
  • [4] GOODHART J, 1999, INFORMS NAT M CINC O
  • [5] HALL W, 1999, THESIS OPERATIONS RE
  • [6] HOWARD K, 2000, COMMUNICATION JAN
  • [7] HOWARD K, 1997, COMMUNICATION APR
  • [8] HOWARD K, 1996, COMMUNICATION JUN
  • [9] KNORR D, 1999, R9014501 FFP1
  • [10] WAMBSGANSS M, 1997, AIR TRAFFIC CONTROL, V4, P107