共 50 条
- [1] Post-construction monitoring and analysis for highway tunnel lining cracks Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2010, 43 (07): : 97 - 104
- [3] Analysis of construction and post-construction settlement data caused by immersed tunnel Wei, G. (weig@zucc.edu.cn), 1600, Academia Sinica (32):
- [7] Effects of jack force and construction steps on the change of lining stresses in a TBM tunnel KSCE J. Civ. Eng., 4 (1135-1146):
- [9] Effects of jack force and construction steps on the change of lining stresses in a TBM tunnel KSCE Journal of Civil Engineering, 2017, 21 : 1135 - 1146
- [10] CLIMATIC INFLUENCES ON THE FINAL TUNNEL LINING GEOCONFERENCE ON SCIENCE AND TECHNOLOGIES IN GEOLOGY, EXPLORATION AND MINING, SGEM 2014, VOL II, 2014, : 163 - 170