Tunnel post-construction actions and stresses in the final lining

被引:0
|
作者
Flor, AFT [1 ]
Santos-Pereira, C [1 ]
机构
[1] COBA Consultants Engn & Environm, Lisbon, Portugal
来源
TUNNELS AND METROPOLISES, VOLS 1 AND 2 | 1998年
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In this paper loads due to consolidation, cyclic loading, creep and seismic waves on tunnels are studied. The contributions of each of these actions to the stress variation in the final lining of tunnels with circular sections in cohesive soil are analysed. In order to calculate those stresses in the final lining a formulation is suggested.
引用
收藏
页码:309 / 314
页数:6
相关论文
共 50 条
  • [1] Post-construction monitoring and analysis for highway tunnel lining cracks
    Ye, Fei
    He, Chuan
    Xia, Yongxu
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2010, 43 (07): : 97 - 104
  • [2] Post-construction infield lining rehabs subsea pipelines
    Walters, Robert
    OIL & GAS JOURNAL, 2014, 112 (08) : 82 - 84
  • [3] Analysis of construction and post-construction settlement data caused by immersed tunnel
    Wei, G. (weig@zucc.edu.cn), 1600, Academia Sinica (32):
  • [4] 'Post-Construction'
    Ryan, K
    POETRY, 2002, 179 (04) : 193 - 193
  • [5] Post-construction interviews
    Ehmke, Greg
    PCI JOURNAL, 2007, 52 (01): : 27 - 27
  • [6] POST-CONSTRUCTION SERVICES
    OKANE, R
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 1993, : 64 - 67
  • [7] Effects of jack force and construction steps on the change of lining stresses in a TBM tunnel
    Yonsei Institute of Smart Space, Seoul
    03722, Korea, Republic of
    不详
    10223, Korea, Republic of
    不详
    04195, Korea, Republic of
    不详
    03722, Korea, Republic of
    KSCE J. Civ. Eng., 4 (1135-1146):
  • [8] Effects of Jack Force and Construction Steps on the Change of Lining Stresses in a TBM Tunnel
    Cho, Seok Ho
    Kim, Jeongsoo
    Won, Jonghwa
    Kim, Moon Kyum
    KSCE JOURNAL OF CIVIL ENGINEERING, 2017, 21 (04) : 1135 - 1146
  • [9] Effects of jack force and construction steps on the change of lining stresses in a TBM tunnel
    Seok Ho Cho
    Jeongsoo Kim
    Jonghwa Won
    Moon Kyum Kim
    KSCE Journal of Civil Engineering, 2017, 21 : 1135 - 1146
  • [10] CLIMATIC INFLUENCES ON THE FINAL TUNNEL LINING
    Duris, Lukas
    Aldorf, Josef
    Geryk, Jiri
    GEOCONFERENCE ON SCIENCE AND TECHNOLOGIES IN GEOLOGY, EXPLORATION AND MINING, SGEM 2014, VOL II, 2014, : 163 - 170