Minimizing mean flow times criteria on a single batch processing machine with non-identical jobs sizes

被引:7
作者
Ghazvini, FJ [1 ]
Dupont, L [1 ]
机构
[1] Inst Natl Polytech Grenoble, Ecole Natl Super Genie Ind, Lab GILCO 46, F-38031 Grenoble, France
关键词
scheduling; batch processing machine; mean flow time; heuristic;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper considers the problem of scheduling jobs with non-identical capacity requirements or sizes on a single-batch processing machine (BPM) to minimize the mean-flow times of jobs. A batch processing machine is one which can process up to B jobs simultaneously. The processing time of a batch is equal to the longest processing time among all jobs in the batch. We provide various new heuristics for this problem. Computational experiments shaw that the heuristics are capable of obtaining near-optimal solutions in very reasonable CPU times. (C) 1998 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:273 / 280
页数:8
相关论文
共 18 条
  • [1] BATCHING AND SCHEDULING JOBS ON BATCH AND DISCRETE PROCESSORS
    AHMADI, JH
    AHMADI, RH
    DASU, S
    TANG, CS
    [J]. OPERATIONS RESEARCH, 1992, 40 (04) : 750 - 763
  • [2] BRUCKER P, 1996, SCHEDULING BATCHING
  • [3] MINIMIZING TOTAL COMPLETION-TIME ON A BATCH PROCESSING MACHINE WITH JOB FAMILIES
    CHANDRU, V
    LEE, CY
    UZSOY, R
    [J]. OPERATIONS RESEARCH LETTERS, 1993, 13 (02) : 61 - 65
  • [4] MINIMIZING TOTAL COMPLETION-TIME ON BATCH PROCESSING MACHINES
    CHANDRU, V
    LEE, CY
    UZSOY, R
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (09) : 2097 - 2121
  • [5] Dobson G., 1992, BATCH LOADING SCHEDU
  • [6] DuPont L, 1997, INT J IND ENG-APPL P, V4, P197
  • [7] DUPONT L, 1997, P 2 INT FRENCH QUEB
  • [8] DUPONT L, 1997, P INT C IND ENG PROD, P57
  • [9] HOCHBAUM DS, 1994, 948 ESRC U CAL
  • [10] EFFICIENT SCHEDULING ALGORITHMS FOR A SINGLE BATCH PROCESSING MACHINE
    IKURA, Y
    GIMPLE, M
    [J]. OPERATIONS RESEARCH LETTERS, 1986, 5 (02) : 61 - 65