Dam failure risk factor analysis using AHP method

被引:2
作者
Daud, Nurhidayati Mat [1 ]
Hassan, Siti Hafizan [1 ]
Akbar, Nor Azliza [1 ]
Abu Bakar, Amalina Amirah [1 ]
Mohamad, Nor Akmal Shuhada [1 ]
Abd Manan, Ernie [2 ]
Hamzah, Ahmad Farhan [2 ]
机构
[1] Univ Teknol MARA, Fac Civil Engn, Permatang Pauh 13500, Pulau Pinang, Malaysia
[2] Inst Penyelidikan Hidraul Kebangsaan Malaysia, Lot 5377,Jalan Putra Permai, Seri Kembangan 43300, Selangor, Malaysia
来源
3RD INTERNATIONAL CONFERENCE ON CIVIL AND ENVIRONMENTAL ENGINEERING | 2021年 / 646卷
关键词
D O I
10.1088/1755-1315/646/1/012042
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Bukit Merah Dam is Malaysia's oldest dam and the risk of failure probability is rising as the dam aging physically. The number and magnitude of maximal precipitations caused by changes in weather have been increasing and directly increase the likelihood of developing a dam failure. Risk analysis usually incorporates the theory of probability and the mathematical statistics to obtain the risk of dam failure within the framework of dam safety. However, the experience and judgment of the dam experts are not considered in determining the risk of dams failure. This study aims to determine the risk factor of Bukit Merah Dam through the Delphi technique and to assess the risk factor impacts due to dam failures using the AHP method. There are three risk factors or criteria highlighted in this research which are structural, human and natural. According to the results for the structural criteria, the priority is seepage where the final weight is 70.1%. For the human criteria, the priority is operational mismanagement with the final weight of 58.46%, 31.45%. Lastly, for the natural criteria, the priority is flooding from high precipitation with a final weight of 48.57%. From the consistency ratio, the CR for structural factor is 0.041 while for the human factor is 0.014 and for natural criteria is 0.019. As all the CR value for this criteria is less than 0.1, all participants' evaluations about dam failure criteria are consistent. In conclusion, the dam operators need to be more vigilant to seepage, operational mismanagement and flooding from high precipitation factors of failure for Bukit Merah Dam.
引用
收藏
页数:6
相关论文
共 7 条
[1]   Evaluating the knowledge, relevance and experience of expert decision makers utilizing the Fuzzy-AHP [J].
Aly, S. ;
Vrana, I. .
AGRICULTURAL ECONOMICS-ZEMEDELSKA EKONOMIKA, 2008, 54 (11) :529-535
[2]  
[Anonymous], 1970, HAZARDS RISKS FAILUR
[3]   Managing risks of the Grand Ethiopian Renaissance Dam on Egypt [J].
El-Nashar, Walaa Y. ;
Elyamany, Ahmed H. .
AIN SHAMS ENGINEERING JOURNAL, 2018, 9 (04) :2383-2388
[4]   Hydrological Risk Assessment of Old Dams: Case Study on Wilson Dam of Tennessee River Basin [J].
Gebregiorgis, Abebe S. ;
Hossain, Faisal .
JOURNAL OF HYDROLOGIC ENGINEERING, 2012, 17 (01) :201-212
[5]  
Khaleghi S., 2013, WORLD APPL PROGRAM, V3, P417
[6]   Water resource vulnerability assessment in Rawalpindi and Islamabad, Pakistan using Analytic Hierarchy Process (AHP) [J].
Shabbir, Rabia ;
Ahmad, Sheikh Saeed .
JOURNAL OF KING SAUD UNIVERSITY SCIENCE, 2016, 28 (04) :293-299
[7]  
Sidek L. M, IMPLEMENTATION DAM S