Investment for process quality improvement and setup cost reduction in an imperfect production process with warranty policy and shortages

被引:34
作者
Guchhait, Rekha [4 ]
Dey, Bikash Koli [1 ]
Bhuniya, Shaktipada [1 ]
Ganguly, Baisakhi [1 ]
Mandal, Buddhadev [2 ]
Bachar, Raj Kumar [3 ]
Sarkar, Biswajit [4 ]
Wee, Huiming [5 ]
Chaudhuri, Kripasindhu [6 ]
机构
[1] Banasthali Vidyapith, Dept Math & Stat, Banasthali 304022, Rajasthan, India
[2] Vidyasagar Univ, Dept Appl Math Oceanol & Comp Programming, Midnapore 721102, India
[3] Kazi Naazrul Univ, Dept Math, Asansol 713340, W Bengal, India
[4] Yonsei Univ, Dept Ind Engn, 50 Yonsei Ro, Seoul 03722, South Korea
[5] Chung Yuan Christian Univ, Dept Ind & Syst Engn, Chungli 32023, Taiwan
[6] Jadavpur Univ, Dept Math, Kolkata 700032, India
关键词
Imperfect production; setup cost reduction; process quality improvement; warranty; shortages; ECONOMIC PRODUCTION QUANTITY; PRODUCTION-INVENTORY MODEL; TIME-VARYING DETERIORATION; PRODUCTION SYSTEM; DEPENDENT DEMAND; REWORK PROCESS; SELLING PRICE; SUPPLY CHAIN; RELIABILITY; BACKORDERS;
D O I
10.1051/ro/2018101
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Cost reduction for setup and improvement of processes quality are the main target of this research along with free minimal repair warranty for an imperfect production System. This paper deals with the effect of setup cost reduction and process quality improvement on the optimal production cycle time for an imperfect production process with free product minimal repair warranty. Here the production system is subject to a random breakdown from an controlled system to an out-of-control state. Shortages are fully backlogged. The main target to minimize the total cost by simultaneously optimizing the production run time, setup cost, and process quality. A solution algorithm with some numerical experiments are provided such as the proposed model can illustrate briefly. Sensitivity analysis section is decorated for the optimal solution of the model with respect to major cost parameters of the system are carried out, and the implications of the analysis are discussed.
引用
收藏
页码:251 / 266
页数:16
相关论文
共 43 条
[1]   The economic production quantity (EPQ) with shortage derived algebraically [J].
Cárdenas-Barrón, LE .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2001, 70 (03) :289-292
[2]   An optimal production run time with imperfect production processes and allowable shortages [J].
Chung, KJ ;
Hou, KL .
COMPUTERS & OPERATIONS RESEARCH, 2003, 30 (04) :483-490
[3]  
Das Roy M, 2017, J ADV MANAG RES, V14, P408, DOI 10.1108/JAMR-10-2016-0086
[4]  
Deb M., 1987, Journal of the Operational Research Society, V38, P459
[5]   AN INTEGRATED INVENTORY MODEL INVOLVING DISCRETE SETUP COST REDUCTION, VARIABLE SAFETY FACTOR, SELLING PRICE DEPENDENT DEMAND, AND INVESTMENT [J].
Dey, Bikash Koli ;
Sarkar, Biswajit ;
Sarkar, Mitali ;
Pareek, Sarla .
RAIRO-OPERATIONS RESEARCH, 2019, 53 (01) :39-57
[6]   The derivation of EOQ/EPQ inventory models with two backorders costs using analytic geometry and algebra [J].
Eduardo Cardenas-Barron, Leopoldo .
APPLIED MATHEMATICAL MODELLING, 2011, 35 (05) :2394-2407
[7]   Economic production quantity with rework process at a single-stage manufacturing system with planned backorders [J].
Eduardo Cardenas-Barron, Leopoldo .
COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 57 (03) :1105-1113
[8]   On optimal batch sizing in a multi-stage production system with rework consideration [J].
Eduardo Cardenas-Barron, Leopoldo .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 196 (03) :1238-1244
[9]  
Goyal SK., 2005, IND ENG J, V34, P33
[10]   PRODUCTION LOT SIZING WITH MACHINE BREAKDOWNS [J].
GROENEVELT, H ;
PINTELON, L ;
SEIDMANN, A .
MANAGEMENT SCIENCE, 1992, 38 (01) :104-123