Run-to-run process control of a plasma etch process with neural network modelling

被引:0
|
作者
Card, JP [1 ]
Naimo, M [1 ]
Ziminsky, W [1 ]
机构
[1] Digital Semicond, Hudson, MA 01749 USA
关键词
neural network; dynamic process control; plasma etch; semiconductor fabrication; process control; optimization; integrated circuit; semiconductor; cascade correlation;
D O I
10.1002/(SICI)1099-1638(199807/08)14:4<247::AID-QRE188>3.3.CO;2-M
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Run-to-run control of a plasma etch process for 8 inch diameter silicon wafers at Digital Semiconductor is determined by maintenance of targeted values of post-etch metrology variables. The post-etch quality variables are extremely sensitive to variation in the etch chamber conditions due to fluctuation in temperature, pressure, gas flow rates, etc., the aging of process tool parts and time since last chamber cleans. The target parameter drifts due to part wear and impurity build-up are long-term and distinct in character from the more immediate action of chamber parameter disturbance. We have modelled the multivariable and multimodal action of output etch parameter variation using a neural network prediction model coupled with an heuristic non-linear feedback loop to determine optimal corrective action to be performed between runs to ensure on-going etch tool control. The neural networks exhibited overall accuracy to within 20% of the observed values of 0.986, 0.938 and 0.87 for the post-etch rate, standard deviation and selectivity variables respectively. We present the neural model design with specially adapted input parameter transforms and results of training, test and validation sample fits for 148 monitor wafer records. The control unit was able to detect accurately the need for part replacements and wet clean operations in 34 of 40 operations and offered suggested process setting changes which were consistent with engineers' understanding of adjustments which would yield output parameters closer to the targeted values. Our current work extends previous modelling of the 6 inch wafer plasma etch process to 8 inch wafers with the addition of genetic algorithms for input variable selection and optimization algorithm improvements. In addition, we have installed a real-time shop floor data collection utility with extensive data quality assurance, enabling the controller to be implemented on a run-to-run basis with neural network updates between monitor etch runs. In this way the tool operator gets feedback as to necessary process and part changes immediately following quality wafer checks and before production lots are processed. This speed of implementation is the first of its kind in the semiconductor fabrication process arena. (C)1998 John Wiley & Sons, Ltd.
引用
收藏
页码:247 / 260
页数:14
相关论文
共 50 条
  • [1] Critical dimension control of a plasma etch process by integrating feedforward and feedback run-to-run control
    El Chemali, C
    Freudenberg, J
    Hankinson, M
    Collison, W
    Ni, T
    JOURNAL OF VACUUM SCIENCE & TECHNOLOGY B, 2003, 21 (06): : 2304 - 2312
  • [2] Run-To-Run control of the Czochralski process
    Rahnianpour, Parsa
    Saelid, Steinar
    Hovd, Morten
    COMPUTERS & CHEMICAL ENGINEERING, 2017, 104 : 353 - 365
  • [3] Run-to-run process control with qualitative information
    Wang, KB
    Tsung, FG
    Proceedings of the 4th International Conference on Quality & Reliability, 2005, : 253 - 259
  • [4] Factory-wide run-to-run process control
    Yelverton, M
    Tsakalis, K
    Stoddard, K
    SOLID STATE TECHNOLOGY, 1999, 42 (12) : 45 - +
  • [5] Run-to-run process control: Literature review and extensions
    DelCastillo, E
    Hurwitz, AM
    JOURNAL OF QUALITY TECHNOLOGY, 1997, 29 (02) : 184 - 196
  • [6] CMP process run-to-run control to adjust margin in control limit
    Morisawa, Toshihiro
    Abe, Hisahiko
    Tachikawa, Kousaku
    Nakajima, Toshihiro
    PRECISION ENGINEERING-JOURNAL OF THE INTERNATIONAL SOCIETIES FOR PRECISION ENGINEERING AND NANOTECHNOLOGY, 2011, 35 (01): : 65 - 72
  • [7] A new run-to-run control method for oxide CMP process
    Wang, J
    He, QP
    DATA ANALYSIS AND MODELING FOR PROCESS CONTROL II, 2005, 5755 : 9 - 17
  • [8] A RLS Run-to-Run Control Approach for Semiconductor Manufacturing Process
    Liu, Shujie
    Zheng, Ying
    Luo, Ming
    Wang, Yanwei
    PROCEEDINGS OF THE 10TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA 2012), 2012, : 2642 - 2646
  • [9] A General Harmonic Rule Controller for Run-to-Run Process Control
    He, Fangyi
    Wang, Kaibo
    Jiang, Wei
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2009, 22 (02) : 232 - 244
  • [10] Monitoring of a sampled process data under Run-to-Run control: application to a semiconductor process
    Korabi, Taki Eddine
    Graton, Guillaume
    El Adel, El Mostafa
    Ouladsine, Mustapha
    Pinaton, Jacques
    2019 IEEE 15TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2019, : 930 - 935