Tackling the "last mile" problem in renovation waste management: A case study in China

被引:27
作者
Bao, Zhikang [1 ]
Lu, Weisheng [1 ]
Hao, Jianli [2 ]
机构
[1] Univ Hong Kong, Fac Architecture, Dept Real Estate & Construct, Pokfulam, Hong Kong, Peoples R China
[2] Xian Jiaotong Liverpool Univ, Dept Civil Engn, Suzhou, Peoples R China
关键词
Waste management; Construction; Renovation waste; Waste management system; Last mile problem; DEMOLITION WASTE; CIRCULAR ECONOMY; CONSTRUCTION; FRAMEWORK; PROCUREMENT; GENERATION;
D O I
10.1016/j.scitotenv.2021.148261
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Solid waste generated from building renovation, called "renovation waste" in this study, represents a major waste management problem. A particular difficulty is sourcing renovation waste arising sporadically from discrete sites for central processing. This can be characterized as a "last mile" problem in renovation waste management (RWM). This study reports good practice for dealing with the RWM last mile problem in a city in China. We conduct qualitative research comprising site investigations and interviews, organized in an in-depth case study. We discover that the city effectively solved the last mile problem by developing a multi-layer, nested waste management system, empowered further by various smart technologies and concerted collaboration from multi-stakeholders coordinated by a determined government. Nevertheless, the longevity of the RWM is contingent on confronting several challenges, including (a) achieving cost and benefit balance, (b) defining clearer standards and policies, and (c) raising stakeholders' awareness of waste management. A general RWM strategy is recommended to establish fluent channels through which to source and qualify renovation waste for central treatment. The study delves into the much neglected world of RWM and provides a valuable reference for tackling similar problems. (c) 2021 Elsevier B.V. All rights reserved.
引用
收藏
页数:12
相关论文
共 54 条
  • [1] Awareness on waste segregation at source and willingness to pay for collection service in selected markets in Ga West Municipality, Accra, Ghana
    Agbefe, Lois Eyram
    Lawson, Elaine Tweneboah
    Yirenya-Tawiah, Dzidzo
    [J]. JOURNAL OF MATERIAL CYCLES AND WASTE MANAGEMENT, 2019, 21 (04) : 905 - 914
  • [2] Hierarchical modelling of Last Mile logistic distribution system
    Aized, Tauseef
    Srai, Jagjit Singh
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 70 (5-8) : 1053 - 1061
  • [3] Successful waste management strategies in developing countries require meaningful involvement of the concerned stakeholders
    Alamgir, Muhammed
    Bidlingmaier, Werner
    Cossu, Raffaello
    [J]. WASTE MANAGEMENT, 2012, 32 (11) : 2007 - 2008
  • [4] [Anonymous], 2018, DESIGN CHOOSING 5 AP
  • [5] A profit-oriented mathematical model for hazardous waste locating-routing problem
    Aydemir-Karadag, Ayyuce
    [J]. JOURNAL OF CLEANER PRODUCTION, 2018, 202 : 213 - 225
  • [6] A decision-support framework for planning construction waste recycling: A case study of Shenzhen, China
    Bao, Zhikang
    Lu, Weisheng
    [J]. JOURNAL OF CLEANER PRODUCTION, 2021, 309
  • [7] Implementing on-site construction waste recycling in Hong Kong: Barriers and facilitators
    Bao, Zhikang
    Lee, Wendy M. W.
    Lu, Weisheng
    [J]. SCIENCE OF THE TOTAL ENVIRONMENT, 2020, 747
  • [8] Developing ef ficient circularity for construction and demolition waste management in fast emerging economies: Lessons learned from Shenzhen, China
    Bao, Zhikang
    Lu, Weisheng
    [J]. SCIENCE OF THE TOTAL ENVIRONMENT, 2020, 724 (724)
  • [9] Procurement innovation for a circular economy of construction and demolition waste: Lessons learnt from Suzhou, China
    Bao, Zhikang
    Lu, Weisheng
    Chi, Bin
    Yuan, Hongping
    Hao, Jianli
    [J]. WASTE MANAGEMENT, 2019, 99 : 12 - 21
  • [10] Boon E.K., 2020, MATER CIRC ECON, V2, P1