Reliability assessment and activation sequence optimization of non repairable multi-state generation systems considering warm standby

被引:23
作者
Jia Heping [1 ]
Ding Yi [2 ]
Peng Rui [3 ]
Liu Hanlin [4 ]
Song Yonghua [2 ,5 ]
机构
[1] North China Elect Power Univ, Sch Econ & Management, Beijing, Peoples R China
[2] Zhejiang Univ, Coll Elect Engn, Hangzhou, Peoples R China
[3] Beijing Univ Technol, Sch Econ & Management, Beijing, Peoples R China
[4] State Grid Zhejiang Elect Power Co Ltd, Informat & Telecommun Branch, Hangzhou, Peoples R China
[5] Univ Macau, Macau, Peoples R China
基金
中国博士后科学基金; 中国国家自然科学基金;
关键词
Reliability assessment; Activation sequence optimization; Power generation systems; Warm standby; Multi-state decision diagram; POWER-SYSTEMS; PENETRATION; TERM;
D O I
10.1016/j.ress.2019.106736
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Warm standby has been widely applied to power generation systems to ensure safe and reliable operation with lower energy consumption and shorter leading time compared with the case of hot standby and cold standby, respectively. Since there is a series of intermediate states between perfect functioning and complete failure for generating units, multi-state characteristics emerge in power generation systems. Considering different parameters of state transition time distributions before and after activation of standby units, as well as generating units with arbitrary state transition time distributions, this entails a need to propose a reliability evaluation technique to handle multi-state power generation systems considering warm standby with arbitrary state transition time distributions. An analytic method based on multi-state decision diagram (MSDD) is proposed in this paper for the reliability analysis of the proposed systems considering successful activation probabilities of warm standby units. The MSDD-based technique is applicable to multi-state power generation systems with arbitrary state transition time distributions for generating units. The proposed method enables the automated calculation of the system reliability and expected surplus performance. Furthermore, the optimum sequence of activating warm standby units that maximizes system reliability is formulated based on the proposed automatic reliability calculation method. Illustrative examples are provided to validate the effectiveness of the proposed technique.
引用
收藏
页数:12
相关论文
共 36 条
[1]   Reliability Characteristics of k-out-of-n Warm Standby Systems [J].
Amari, Suprasad V. ;
Hoang Pham ;
Misra, Ravindra B. .
IEEE TRANSACTIONS ON RELIABILITY, 2012, 61 (04) :1007-1018
[2]  
Amari Suprasad V., 2010, RELIABILITY MAINTAIN
[3]  
[Anonymous], 2013, RELIABILITY EVALUATI
[4]  
[Anonymous], RELIAB ENG SYST SAFE
[5]   AN ADAPTIVE ALGORITHM FOR THE APPROXIMATE CALCULATION OF MULTIPLE INTEGRALS [J].
BERNTSEN, J ;
ESPELID, TO ;
GENZ, A .
ACM TRANSACTIONS ON MATHEMATICAL SOFTWARE, 1991, 17 (04) :437-451
[6]   ERROR ESTIMATION IN AUTOMATIC QUADRATURE ROUTINES [J].
BERNTSEN, J ;
ESPELID, TO .
ACM TRANSACTIONS ON MATHEMATICAL SOFTWARE, 1991, 17 (02) :233-252
[7]   Generating capacity adequacy associated with wind energy [J].
Billinton, R ;
Bai, G .
IEEE TRANSACTIONS ON ENERGY CONVERSION, 2004, 19 (03) :641-646
[8]   A RELIABILITY TEST SYSTEM FOR EDUCATIONAL PURPOSES - BASIC DATA [J].
BILLINTON, R ;
KUMAR, S ;
CHOWDHURY, N ;
CHU, K ;
DEBNATH, K ;
GOEL, L ;
KHAN, E ;
KOS, P ;
NOURBAKHSH, G ;
OTENGADJEI, J .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1989, 4 (03) :1238-1244
[9]  
Billinton R., 1992, RELIABILITY EVALUATI
[10]  
BRYANT RE, 1986, IEEE T COMPUT, V35, P677, DOI 10.1109/TC.1986.1676819