Effects of construction sequence of double basement excavations on an existing floating pile

被引:31
作者
Shi, Jiangwei [1 ,2 ]
Wei, Jiaqi [3 ]
Ng, Charles W. W. [4 ]
Lu, Hu [5 ]
Ma, Shaokun [2 ]
Shi, Chao [6 ]
Li, Ping [1 ]
机构
[1] Hohai Univ, Minist Educ, Key Lab Geomech & Embankment Engn, 1 Xikang Rd, Nanjing 210024, Peoples R China
[2] Guangxi Univ, Guangxi Key Lab Disaster Prevent & Engn Safety, Nanning, Peoples R China
[3] SGIDI Engn Consulting Grp Co Ltd, Shanghai 200093, Peoples R China
[4] Hong Kong Univ Sci & Technol, Dept Civil & Environm Engn, Kowloon, Clear Water Bay, Hong Kong, Peoples R China
[5] Shenzhen Polytech, 7098 Liu Xian Ave, Shenzhen, Peoples R China
[6] City Univ Hong Kong, Dept Architecture & Civil Engn, Kowloon, Tat Chee Ave, Hong Kong, Peoples R China
基金
中国国家自然科学基金;
关键词
Centrifuge modelling; Double basements; Construction sequence; Pile; Settlement; Bending moment; BEHAVIOR; ADJACENT; CLAY; SUBJECT; FAILURE; MODEL;
D O I
10.1016/j.tust.2021.104230
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Deep excavations inevitably induce stress relief and ground movement, which may affect the safety and serviceability of nearby pile foundations. Although research attention was paid to the basement-soil-pile interaction, most of the previous studies focused on responses of end-bearing piles due to a single basement excavation. In this study, centrifuge tests and numerical analyses were conducted to investigate effects of construction sequence of double basement excavations on an existing floating pile in dry sand. For basements excavated sequentially (i.e., multi-propped excavation is conducted before cantilever excavation), the measured pile settlements due to multi-propped and cantilever excavations are 0.42% dp and 0.72% dp (pile diameter), respectively. This is because multi-propped excavation causes a reduction of soil shear modulus, and cantilever basement has much smaller support system stiffness than multi-propped basement. The horizontal soil movement and pile bending moment due to multi-propped excavation are reversed during cantilever excavation. Upon completion of double basement excavations, construction sequence of double basements (i.e., excavated sequentially and simultaneously) has limited effects on pile head settlement. But the maximum bending moment due to double basements excavated simultaneously is only 18.9% of that due to double basements excavated sequentially. To ensure the safety and serviceability of existing pile foundation, it is suggested to construct double basements simultaneously rather than sequentially.
引用
收藏
页数:13
相关论文
共 55 条
[1]  
Bjerrum L., 1963, PROC 3 EUROPEAN C SO, P135
[2]   BEHAVIOR OF DIAPHRAGM WALLS IN CLAY PRIOR TO COLLAPSE [J].
BOLTON, MD ;
POWRIE, W .
GEOTECHNIQUE, 1988, 38 (02) :167-189
[3]  
Broms B., 1979, P OFTHE 6 ASIAN REGI, V2, P41
[4]  
Broms B., 1964, J SOIL MECH FDN DIV, V90, P27, DOI [10.1061/JSFEAQ.0000611, DOI 10.1061/JSFEAQ.0000611]
[5]   Analytical solution for longitudinal vibration of a floating pile in saturated porous media based on a fictitious saturated soil pile model [J].
Cui, Chunyi ;
Meng, Kun ;
Xu, Chengshun ;
Liang, Zhimeng ;
Li, Haijiang ;
Pei, Huafu .
COMPUTERS AND GEOTECHNICS, 2021, 131
[6]   ANALYSIS OF PERFORMANCE OF PILE GROUPS ADJACENT TO DEEP EXCAVATION [J].
FINNO, RJ ;
LAWRENCE, SA ;
ALLAWH, NF ;
HARAHAP, IS .
JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE, 1991, 117 (06) :934-955
[7]  
Gaba A.R, 2003, C580 CONSTR IND INF
[8]   Pile response adjacent to braced excavation [J].
Goh, ATC ;
Wong, KS ;
Teh, CI ;
Wen, D .
JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2003, 129 (04) :383-386
[9]  
Gudehus G.A., 1996, SOILS FOUND, V36, P1, DOI [10.3208/sandf.36.1, DOI 10.3208/SANDF.36.1]
[10]  
Herle I, 1999, MECH COHES-FRICT MAT, V4, P461, DOI 10.1002/(SICI)1099-1484(199909)4:5<461::AID-CFM71>3.0.CO