Application of neural networks in resolution of disputes for escalation clause using neuro-solutions

被引:8
作者
Chaphalkar, N. B. [1 ]
Sandbhor, Sayali S. [2 ,3 ]
机构
[1] Coll Engn Pune, Dept Civil Engn, Pune 411005, Maharashtra, India
[2] Coll Engn Pune, Pune 411005, Maharashtra, India
[3] SIU, Symbiosis Inst Technol, Dept Civil Engn, Pune 412115, Maharashtra, India
关键词
construction contracts; construction disputes; price escalation; neural networks; neuro-solutions; PREDICTION;
D O I
10.1007/s12205-014-1161-3
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Increasing scope and complexity of construction industry, results into clashes of interests among the parties to the contract. Clashes lead to claims which may culminate into disputes. Project duration being considerable, escalation forms one of the reasons for occurrence of disputes. Dispute resolution consumes valuable time and money of the parties involved. Hence a faster, convenient and cheaper method needs to be evolved. This study throws light on the possibility of implementing neural networks in resolving disputes arising out of escalation claims. For this, factors influencing the decisions for escalation claims are identified and Neuro-solutions is implemented for network building. Various iterations help to assess the effect of change in network parameters. Comparison of their results is made in the study giving an optimum combination of parameters for effective resolution of escalation disputes using neural network. The approach is demonstrated to be a feasible alternative and the network is able to give a very high prediction rate.
引用
收藏
页码:10 / 16
页数:7
相关论文
共 22 条
  • [1] [Anonymous], 1998, J COMPUTER AIDED CIV, DOI DOI 10.1111/0885-9507.00087
  • [2] Arditi D., 1989, International Journal of Project Management, V7, P141, DOI 10.1016/0263-7863(89)90032-X
  • [3] Chaphalkar N. B., 2012, J CONSTRUCTION ENG T, VII, P1
  • [4] Application of a PSO-based neural network in analysis of outcomes of construction claims
    Chau, K. W.
    [J]. AUTOMATION IN CONSTRUCTION, 2007, 16 (05) : 642 - 646
  • [5] Chau KW, 2006, LECT NOTES COMPUT SC, V4031, P548
  • [6] Chau KW, 2005, LECT NOTES ARTIF INT, V3533, P571
  • [7] Problems associated with the process of claim management in Palestine Contractors' perspective
    Enshassi, Adnan
    Mohamed, Sherif
    El-Ghandour, Said
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2009, 16 (01) : 61 - +
  • [8] Hollmén J, 2007, LECT NOTES COMPUT SC, V4723, P1
  • [9] Iyer K. C., 2012, INT J ADV MANAGEMENT, VI, P115
  • [10] Iyer KC., 2002, Int J Proj Manag, V20, P13