An empirical analysis of heuristics for solving the two-machine flow shop problem with job release times

被引:7
作者
Kalczynski, Pawel J. [2 ]
Kamburowski, Jerzy [1 ]
机构
[1] Univ Toledo, Dept Informat Operat & Technol Management, Coll Business & Innovat, Toledo, OH 43606 USA
[2] Calif State Univ Fullerton, Steven G Mihaylo Coll Business & Econ, Fullerton, CA 92834 USA
关键词
Scheduling; Sequencing; Heuristic; Simulation; Optimality; Optimality rate; POLYNOMIAL-APPROXIMATION SCHEME; PROBABILISTIC ANALYSIS; SEQUENCING SUBJECT; MAXIMUM LATENESS; ALGORITHM; MAKESPAN;
D O I
10.1016/j.cor.2012.01.011
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The theoretical analysis of heuristics for solving intractable optimization problems has many well-known drawbacks. Constructed instances demonstrating an exceptionally poor worst-case performance of heuristics are typically too peculiar to occur in practice. Theoretical results on the average-case performance of most heuristics could not be established due to the difficulty with the use of probabilistic analysis. Moreover, the heuristics for which some type of asymptotic optimality has been proven are likely to perform questionably in practice. The purpose of this paper is to confront known theoretical results with our empirical results concerning heuristics for solving the strongly NP-hard problem of minimizing the makespan in a two-machine flow shop with job release times. The heuristics' performance is examined with respect to their average and maximum relative errors, as well as their optimality rate, that is, the probability of being optimal. In particular, this allows us to observe that the asymptotic optimality rate of so called "almost surely asymptotically optimal" heuristic can be zero. We also present a new heuristic with short worst-case running time and statistically prove that it outperforms all heuristics known so far. However, our empirical experiments reveal that the heuristic is on average slower that its competitors with much longer worst-case running times. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:2659 / 2665
页数:7
相关论文
共 31 条
[1]  
[Anonymous], 1999, COMPLEXITY APPROXIMA, DOI DOI 10.1007/978-3-642-58412-1
[2]  
[Anonymous], 2001, Approximation algorithms
[3]  
Beier R, 2003, P 35 ANN ACM S THEOR, P232
[4]   Probabilistic analysis of unit-demand vehicle routeing problems [J].
Bompadre, Agustin ;
Dror, Moshe ;
Orlin, James B. .
JOURNAL OF APPLIED PROBABILITY, 2007, 44 (01) :259-278
[5]  
Borgwardt K.-H., 1982, Zeitschrift fur Operations Research, Serie A (Theorie), V26, P157, DOI 10.1007/BF01917108
[6]  
Chen B., 1998, Handbook of Combinatorial Optimization, P1493, DOI [DOI 10.1007/978-1-4613-0303-9_25, 10.1007/978-1-4613-0303-925, DOI 10.1007/978-1-4613-0303-925]
[7]   A computational study with a new algorithm for the three-machine permutation flow-shop problem with release times [J].
Cheng, JL ;
Steiner, G ;
Stephenson, P .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2001, 130 (03) :559-575
[8]  
Cheng JL, 2002, J SCHED, V5, P71, DOI 10.1002/jos.094
[9]   PREEMPTIVE SCHEDULING OF INDEPENDENT JOBS WITH RELEASE AND DUE TIMES ON OPEN, FLOW AND JOB SHOPS [J].
CHO, Y ;
SAHNI, S .
OPERATIONS RESEARCH, 1981, 29 (03) :511-522
[10]   A hard dial-a-ride problem that is easy on average [J].
Coja-Oghlan, A ;
Krumke, SO ;
Nierhoff, T .
JOURNAL OF SCHEDULING, 2005, 8 (03) :197-210