Case Study of the Largest Concrete Earth Pressure Balance Pipe-Jacking Project in the World

被引:34
作者
Jiang, Xi [1 ,2 ,3 ]
Zhang, Xuehui [4 ]
Wang, Shuai [5 ]
Bai, Yun [1 ,2 ]
Huang, Baoshan [3 ]
机构
[1] Tongji Univ, Coll Civil Engn, Dept Geotech Engn, Shanghai, Peoples R China
[2] Tongji Univ, Key Lab Geotech & Underground Engn, Minist Educ, Shanghai, Peoples R China
[3] Univ Tennessee, Dept Civil & Environm Engn, Knoxville, TN USA
[4] Delft Univ Technol, Dept Geosci & Engn, Delft, Netherlands
[5] Shanghai Rd & Bridge Grp Co Ltd, Shanghai, Peoples R China
关键词
pipe jacking; grouting; infrastructure; lining; tunnels and underground structures; TUNNELS; SHANGHAI;
D O I
10.1177/03611981221076842
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Pipe jacking has been the dominant trenchless technology for constructing small (<2 m) to medium-diameter (<4 m) tunnels. Uncertainties and construction difficulties increase significantly when the diameter of the tunnel exceeds 4 m. This paper presents a case study of the largest concrete pipe-jacking tunnel project in the world, the sewerage tunnel along Jinshan Lake, Zhenjiang, China. In this project, an underwater tunnel with a diameter of 4.67 m was constructed by the earth pressure balance (EPB) pipe-jacking method. The case study reports project background, and geological and hydrogeology conditions. The key techniques such as the selection of pipe-jacking machine, jacking force estimation and control, design of intermediate jacking station, grouting process control, launching, and reception of the tunnel boring machine, trajectory control of pipe jacking, and ventilation and gas monitoring during the construction period were investigated and discussed. Furthermore, to overcome the technical difficulties associated with the oversized jacked tunnel, the corresponding countermeasures were adopted point by point, so that the safety of the whole project could be guaranteed. This study filled the knowledge gap of technical know-how for large-diameter (over 4.5 m) pipe-jacking tunnel and is expected to provide practical guide for future large-diameter pipe-jacking tunnels.
引用
收藏
页码:92 / 105
页数:14
相关论文
共 24 条
[1]  
[Anonymous], 2009, GB 50021-2001
[2]  
[Anonymous], 2019, Standard for Geotechnical Testing Method
[3]  
[Anonymous], 2017, ELECTRON J GEOTECH E
[4]   Investigation of a methane flare during the excavation of the Silvan irrigation tunnel, Turkey [J].
Ayhan, Mustafa ;
Aydin, Deniz ;
Imamoglu, M. Sefik ;
Cogalan, Mustafa ;
Karakus, Askeri .
BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2019, 78 (04) :2641-2652
[5]   Long rectangular box jacking project: A case study [J].
Chen, Xiaolong ;
Ma, Baosong ;
Najafi, Mohammad ;
Zhang, Peng .
UNDERGROUND SPACE, 2021, 6 (02) :101-125
[6]   Field performance of concrete pipes during jacking in cemented sandy silt [J].
Cui, Qing-Long ;
Xu, Ye-Shuang ;
Shen, Shui-Long ;
Yin, Zhen-Yu ;
Horpibulsuk, Suksun .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2015, 49 :336-344
[7]   Methane explosion accidents of tunnels in SW China [J].
He, Siyue ;
Su, Linjian ;
Fan, Haobo ;
Ren, Rui .
GEOMATICS NATURAL HAZARDS & RISK, 2019, 10 (01) :667-677
[8]   A method to estimate the jacking force for pipe jacking in sandy soils [J].
Ji, Xinbo ;
Zhao, Wen ;
Ni, Pengpeng ;
Barla, Marco ;
Han, Jianyong ;
Jia, Pengjiao ;
Chen, Yang ;
Zhang, Chaozhe .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 90 :119-130
[9]   Study on Risks and Countermeasures of Shallow Biogas during Construction of Metro Tunnels by Shield Boring Machine [J].
Jiang, Xi ;
Zhang, Yuxin ;
Zhang, Zhuanzhuan ;
Bai, Yun .
TRANSPORTATION RESEARCH RECORD, 2021, 2675 (07) :105-116
[10]   Site-based research in pipe jacking - Objectives, procedures and a case history [J].
Milligan, GWE ;
Norris, P .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 1996, 11 :3-24