On Short-Circuit Current Calculations Including Superconducting Fault Current Limiters (ScFCLs)

被引:19
作者
Castro, Luis Miguel [1 ]
Guillen, Daniel [1 ]
Trillaud, Frederic [2 ]
机构
[1] Univ Nacl Autonoma Mexico, Dept Elect Energy, Mexico City 04510, DF, Mexico
[2] Univ Nacl Autonoma Mexico, Inst Engn, Mexico City 04510, DF, Mexico
关键词
Fault currents; Newton-Raphson method; nodal impedance matrix; short-circuit studies; superconducting fault current limiters (SCFCL); symmetrical components; PROTECTION COORDINATION; POWER-SYSTEMS; INDUSTRIAL; NETWORK; VOLTAGE;
D O I
10.1109/TPWRD.2018.2800732
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper introduces a novel modeling approach for short-circuit studies incorporating superconducting fault current limiters (ScFCLs). The conventional formulation for short circuit studies, based on symmetrical components, has been extended to include the nonlinear limiting features of the ScFCL. Indeed, this is a novel iterative modeling method that has been derived from the classical calculations of short circuits. The operating point of the ScFCL is computed in the abc reference frame, while the solution of the whole network, including all of its components, is achieved using symmetrical components. The ScFCL model, which includes various parallel-connected superconducting tapes, is derived for the positive, negative, and zero sequences. Given that the resistance of the ScFCL is nonlinear and depends on the current flow, an iterative process is used to carry out shortcircuit calculations. To validate the proposed method, radial and meshed distribution networks were studied. The solutions derived from the proposed approach and the ones obtained from the electromagnetic transient software Alternative Transients Program-Electromagnetic Transients Program were compared with both solutions agreeing very well with each other. The standard IEEE 14-bus test system, slightly modified to include two ScFCLs, was additionally simulated to demonstrate the practicality of the new approach in larger networks.
引用
收藏
页码:2513 / 2523
页数:11
相关论文
共 29 条
[1]  
Anderson P. M., 1995, Analysis of Faulted Power Systems
[2]  
[Anonymous], P IEEE VEH TECH C SE
[3]  
[Anonymous], 2009, OE1 US DEP EN
[4]  
Bock J., 2011, P 21 INT C EL DIST J, P4
[5]   Overcurrent relays coordination considering transient behaviour of fault current limiter and distributed generation in distribution power network [J].
Chabanloo, R. M. ;
Abyaneh, H. A. ;
Agheli, A. ;
Rastegar, H. .
IET GENERATION TRANSMISSION & DISTRIBUTION, 2011, 5 (09) :903-911
[6]   First commercial medium voltage superconducting fault-current limiters: production, test and installation [J].
Dommerque, R. ;
Kraemer, S. ;
Hobl, A. ;
Boehm, R. ;
Bludau, M. ;
Bock, J. ;
Klaus, D. ;
Piereder, H. ;
Wilson, A. ;
Krueger, T. ;
Pfeiffer, G. ;
Pfeiffer, K. ;
Elschner, S. .
SUPERCONDUCTOR SCIENCE & TECHNOLOGY, 2010, 23 (03)
[7]   A Fortescue Approach for Real-Time Short Circuit Computation in Multiphase Distribution Networks [J].
Jabr, Rabih A. ;
Dzafic, Izudin .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2015, 30 (06) :3276-3285
[8]  
Jain A., 2016, P 6 INT C POW SYST M, P8
[9]   Coil Design of 200 MVA/200 kV DC Superconducting Fault Current Limiter by Employing Iron Yoke [J].
Jiang, Zhe ;
Wang, Yinshun ;
Zhang, Han ;
Kan, Changtao ;
Fu, Yu .
IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2017, 27 (04)
[10]  
Kalsi S.S., 2011, APPL HIGH TEMPERATUR, P332