Supply Chain Risk Assessment: A Fuzzy AHP Approach

被引:31
作者
Ganguly, Kunal K. [1 ]
Kumar, Gopal [2 ]
机构
[1] Indian Inst Management Kashipur, Operat Management & Quantitat Tech, Uttarakhand, India
[2] Indian Inst Management Raipur, Chattisgarh, India
来源
OPERATIONS AND SUPPLY CHAIN MANAGEMENT-AN INTERNATIONAL JOURNAL | 2019年 / 12卷 / 01期
关键词
supply chain risk; risk assessment; fuzzy AHP; multi attribute decision making; MANAGEMENT; PERFORMANCE; SELECTION; MODEL; IMPACT; FLOW;
D O I
10.31387/oscm0360217
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Managing supply chain risk is a big challenge for any organization. The purpose of the paper is to provide a methodology for assessing supply chain risk using the Fuzzy based Analytic Hierarchy Process (Fuzzy AHP). This study presents a comprehensive study to identify the Risk Factors (RFs) in supply chain and evaluate them. In this paper, sixteen risk factors were identified based on extensive literature survey. To limit the scope of the work, focus was on transaction and infrastructural risk and avoiding the demand risk The RFs are formulated as hierarchy structure and Fuzzy AHP as a Multi Attribute Decision Making (MADM) tool applied to judge the viable candidates. A revised risk matrix with a continuous scale was proposed to assess the RFs classes. The result classifies the RFs in different categories (Extreme, High, Medium and Low). Based on this result, some management implications and suggestions are proposed. The revised risk matrix with continuous scale for risk assessment in supply chain is a novel approach.
引用
收藏
页码:1 / 13
页数:13
相关论文
共 80 条
[1]  
Akinrolabu O, 2017, OPER SUPPLY CHAIN MA, V10, P130
[2]   InnoDiff: A project-based model for successful IT innovation diffusion [J].
Altuwaijri, Majid M. ;
Khorsheed, Mohammad S. .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2012, 30 (01) :37-47
[3]  
[Anonymous], 2003, J Supply Chain Manag, DOI 10.1111/j.1745-493X.2003.tb00123.x
[4]  
Atkinson W., 2003, PURCHASING, V132, P43
[5]   Management of risks in information technology projects [J].
Baccarini, D ;
Salm, G ;
Love, PED .
INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2004, 104 (3-4) :286-295
[6]   Risk and risk management in software projects: A reassessment [J].
Bannerman, Paul L. .
JOURNAL OF SYSTEMS AND SOFTWARE, 2008, 81 (12) :2118-2133
[7]   Supplier risk assessment and monitoring for the automotive industry [J].
Blackhurst, Jennifer V. ;
Scheibe, Kevin P. ;
Johnson, Danny J. .
INTERNATIONAL JOURNAL OF PHYSICAL DISTRIBUTION & LOGISTICS MANAGEMENT, 2008, 38 (02) :143-165
[8]   Fuzzy group decision making for selection among computer integrated manufacturing systems [J].
Bozdag, CE ;
Kahraman, C ;
Ruan, D .
COMPUTERS IN INDUSTRY, 2003, 51 (01) :13-29
[9]   FUZZY HIERARCHICAL ANALYSIS [J].
BUCKLEY, JJ .
FUZZY SETS AND SYSTEMS, 1985, 17 (03) :233-247
[10]   Information flow in automotive supply chains - present industrial practice [J].
Childerhouse, P ;
Hermiz, R ;
Mason-Jones, R ;
Popp, A ;
Towill, DR .
INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2003, 103 (3-4) :137-149