Risk Analysis based on Fuzzy Comprehensive Evaluation for Maglev Train Bogie

被引:0
作者
Fan, Chengxin [1 ]
Dou, Fengshan [1 ]
Tong, Baiming [1 ]
Long, Zhiqiang [1 ]
机构
[1] Natl Univ Def Technol, Coll Mechatron Engn & Automat, Engn Res Ctr Maglev Technol, Changsha, Hunan, Peoples R China
来源
2015 CHINESE AUTOMATION CONGRESS (CAC) | 2015年
关键词
maglev train; maglev bogie; risk analysis; analytic hierarchy process; fuzzy comprehensive evaluation; AHP;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The maglev bogie is the key subsystem for maglev train security. To ensure life and property security, it is essential to evaluate its risk level before its operation. However, due to the complexity and uncertainties of maglev bogies, a comprehensive and effective risk analysis method is needed. In this paper, a combinational method of analytic hierarchy process and fuzzy comprehensive evaluation is proposed to assess hazards in a complex maglev bogie system associated with multiple subsystems' failures. Our results show that the degree of maglev bogie's risk is within the range of acceptability. The merits of this work facilitate finding the weak links and determining the maintenance of maglev bogie system.
引用
收藏
页码:952 / 956
页数:5
相关论文
共 13 条
[1]   Evaluating teaching performance based on fuzzy AHP and comprehensive evaluation approach [J].
Chen, Jeng-Fung ;
Hsieh, Ho-Nien ;
Do, Quang Hung .
APPLIED SOFT COMPUTING, 2015, 28 :100-108
[2]   Carrying capacity for the electromagnetic suspension low-speed maglev train on the horizontal curve [J].
Cui Peng ;
Li Jie ;
Liu DeSheng .
SCIENCE CHINA-TECHNOLOGICAL SCIENCES, 2010, 53 (04) :1082-1087
[3]   Fatigue strength evaluation of a bogie frame for urban maglev train with fatigue test on full-scale test rig [J].
Han, Jeong-Woo ;
Kim, Jae-Dong ;
Song, See-Yeob .
ENGINEERING FAILURE ANALYSIS, 2013, 31 :412-420
[4]  
Huang C., 2013, ROLLING STOCK, V51
[5]   Research and application of safety assessment method of gas explosion accident in coal mine based on GRA-ANP-FCE [J].
Nian Qifeng ;
Shi Shiliang ;
Li Runqiu .
2012 INTERNATIONAL SYMPOSIUM ON SAFETY SCIENCE AND TECHNOLOGY, 2012, 45 :106-111
[6]  
Ren Z., 2005, FATIGUE ANAL SIMULAT
[7]   Integrated risk assessment of urban water supply systems from source to tap [J].
Roozbahani, Abbas ;
Zahraie, Banafsheh ;
Tabesh, Massoud .
STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2013, 27 (04) :923-944
[8]  
Saaty T. L., 1980, Agricultural Economics Review, V324, DOI DOI 10.3414/ME10-01-0028
[9]   Fuzzy AHP assessment of water management plans [J].
Srdjevic, Bojan ;
Medeiros, Yvonilde Dantas Pinto .
WATER RESOURCES MANAGEMENT, 2008, 22 (07) :877-894
[10]   Integrative fuzzy set pair model for land ecological security assessment: a case study of Xiaolangdi Reservoir Region, China [J].
Su, Shiliang ;
Chen, Xia ;
DeGloria, Stephen D. ;
Wu, Jiaping .
STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2010, 24 (05) :639-647