Management of inventory under market fluctuations the case of a Canadian high tech company

被引:2
作者
Plaza, Malgorzata [1 ]
David, Iulian [1 ]
Shirazi, Farid [1 ]
机构
[1] Ryerson Univ, 350 Victoria St, Toronto, ON M5B 2K3, Canada
关键词
Inventory management; Kanban; Push/pull systems; Case study; PRODUCTION CONTROL-SYSTEM; TOYOTA PRODUCTION SYSTEM; PULL PRODUCTION SYSTEMS; SUPPLY CHAIN; KANBAN SYSTEM; PERFORMANCE; HYBRID; INFORMATION; PUSH; DEMAND;
D O I
10.1016/j.ijpe.2018.09.007
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The study develops a hybrid inventory management model, which can be used to synchronize the supply of critical purchased components with the output rate of the end product manufactured to the level production strategy. The model combines the demand driven delivery of a "pull" strategy with forecasting techniques used by "push" systems. It consists of a "Pull Signal" (PS) and two cost effectiveness formulas (CEFs). PS triggers purchasing and determines the quantity and timing of supplies that are pulled by production. It is an inventory ordering algorithm, which determines "When and how many critical components should be ordered". Inventory management can become expensive if PS is used to manage the low cost components so CEFs is required to determine "Which components should be managed as critical". The hybrid model is most useful in situations where production lead time is short, purchasing lead time is long and demand patterns vary. It was successfully implemented by a Canadian firm from a computer industry and generated a 27% reduction in a total value of inventory within just 11 months. Additionally, the customer service, cycle times, and even warehouse handling were all significantly improved.
引用
收藏
页码:215 / 227
页数:13
相关论文
共 80 条
[1]  
Aleixo G. G., 2009, INT J IND MANUF ENG, V3, P1988
[2]  
[Anonymous], INTEGRATING REENGINE
[3]  
[Anonymous], 2003, STRATEGIES CASE STUD
[4]  
Atkinson W., 2001, PURCHASING, V9
[5]   Action research [J].
Avison, D ;
Lau, F ;
Myers, M ;
Nielsen, PA .
COMMUNICATIONS OF THE ACM, 1999, 42 (01) :94-97
[6]   Optimal soft-order revisions under demand and supply uncertainty and upstream information [J].
Baruah, Pundarikaksha ;
Chinnam, Ratna Babu ;
Korostelev, Alexander ;
Dalkiran, Evrim .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2016, 182 :14-25
[7]   A hybrid push/pull control algorithm for multistage, multi-line production systems [J].
Beamon, BM ;
Bermudo, JM .
PRODUCTION PLANNING & CONTROL, 2000, 11 (04) :349-356
[8]  
Berkeley B. J., 1992, Production and Operations Management, V1, P393, DOI 10.1111/j.1937-5956.1992.tb00004.x
[9]   QUEUING MODELS OF KANBAN AND MRP CONTROLLED PRODUCTION SYSTEMS [J].
BUZACOTT, JA .
ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1989, 17 (1-4) :3-20
[10]   The allocation of inventory risk in a supply chain: Push, pull, and advance-purchase discount contracts [J].
Cachon, GP .
MANAGEMENT SCIENCE, 2004, 50 (02) :222-238