Modelling and optimization of integrated distributed flow shop scheduling and distribution problems with time windows

被引:70
作者
Hou, Yushuang [1 ]
Fu, Yaping [1 ]
Gao, Kaizhou [2 ]
Zhang, Hui [3 ]
Sadollah, Ali [4 ]
机构
[1] Qingdao Univ, Sch Business, Qingdao 266071, Peoples R China
[2] Macau Univ Sci & Technol, Macau Inst Syst Engn, Macau Taipa 999078, Peoples R China
[3] Jiangsu Univ Sci & Technol, Sch Econ & Management, Zhenjiang 212003, Jiangsu, Peoples R China
[4] Univ Sci & Culture, Dept Mech Engn, Tehran, Iran
基金
中国博士后科学基金; 中国国家自然科学基金;
关键词
Integrated production and distribution; Distributed flow shop scheduling; Distributed production; Vehicle routing problem; Brain storm optimization; BRAIN STORM OPTIMIZATION; VEHICLE-ROUTING PROBLEM; DIFFERENTIAL EVOLUTION ALGORITHM; OPERATIONS; INVENTORY;
D O I
10.1016/j.eswa.2021.115827
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Production and distribution are two essential activities in supply chain management. Currently, integrated production and distribution problems receive much attention because decision-makers devote to improving the operation efficiency of both stages and try to achieve an optimal solution. This work proposes an integrated distributed production and distribution problem with consideration of time windows, in which a set of jobs (i.e., customer orders) needs to be assigned among factories and the jobs are processed on flow shop environments at their associated factories. Then, the completed jobs are delivered by capacitated vehicles to customers in different regions while satisfying given time windows as much as possible. Accordingly, to optimally solve the proposed problem, a mixed integer programming model with minimizing total weighted earliness and tardiness has been established. For the optimization task, an enhanced brain storm optimization algorithm with some particular strategies is designed to handle the considered problem. To assess the performance of the proposed optimization method, several experiments by adopting a set of benchmark test problems are performed, and state-of-the-art optimizers are chosen for comparisons. The obtained optimization results exhibit that the designed algorithm significantly outperforms its rivals and can be considered as an excellent optimizer for solving the studied problem. Besides, compared with the CPLEX solver, the designed optimizer also performs much better for solving large-size problems.
引用
收藏
页数:13
相关论文
共 65 条
[1]   Stochastic vehicle routing problem with heterogeneous vehicles and multiple prioritized time windows: Mathematical modeling and solution approach [J].
Baradaran, Vahid ;
Shafaei, Amir ;
Hosseinian, Amir Hossein .
COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 131 :187-199
[2]   An adaptive large neighbourhood search for the operational integrated production and distribution problem of perishable products [J].
Belo-Filho, M. A. F. ;
Amorim, P. ;
Almada-Lobo, B. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (20) :6040-6058
[3]   SIMULATED ANNEALING [J].
BERTSIMAS, D ;
TSITSIKLIS, J .
STATISTICAL SCIENCE, 1993, 8 (01) :10-15
[4]   Models and algorithms for integrated production and distribution problems [J].
Bo, Vincenzo ;
Bortolini, Marco ;
Malaguti, Enrico ;
Monaci, Michele ;
Mora, Cristina ;
Paronuzzi, Paolo .
COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 154
[5]   Integrated Production and Outbound Distribution Scheduling: Review and Extensions [J].
Chen, Zhi-Long .
OPERATIONS RESEARCH, 2010, 58 (01) :130-148
[6]   A competitive memetic algorithm for the distributed two-stage assembly flow-shop scheduling problem [J].
Deng, Jin ;
Wang, Ling ;
Wang, Sheng-yao ;
Zheng, Xiao-long .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (12) :3561-3577
[7]   Integrated production and distribution scheduling with a perishable product [J].
Devapriya, Priyantha ;
Ferrell, William ;
Geismar, Neil .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 259 (03) :906-916
[8]   Predator-Prey Brain Storm Optimization for DC Brushless Motor [J].
Duan, Haibin ;
Li, Shuangtian ;
Shi, Yuhui .
IEEE TRANSACTIONS ON MAGNETICS, 2013, 49 (10) :5336-5340
[9]   An Effective Artificial Bee Colony for Distributed Lot-Streaming Flowshop Scheduling Problem [J].
Duan, Jun-Hua ;
Meng, Tao ;
Chen, Qing-Da ;
Pan, Quan-Ke .
INTELLIGENT COMPUTING METHODOLOGIES, ICIC 2018, PT III, 2018, 10956 :795-806
[10]   Crowdsource-enabled integrated production and transportation scheduling for smart city logistics [J].
Feng, Xin ;
Chu, Feng ;
Chu, Chengbin ;
Huang, Yufei .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (07) :2157-2176